Estimate the total amount of cost (Php) for concrete works (class "A") based from the following given (F1, C1, and Slab-on-Grade): 10-pcs of F1 (1.2m x 1.2m x 0.3 m) 10-pcs of C1 (0.37 m x 0.4 m x 3.8 m) Floor area of 100mm thk slab-on-grade = 51 sq.m Class AA A B C TABLE 1-2 CONCRETE PROPORTION Cement Mixture 40 kg./Bag 50 kg. / Bag 1:11/2: 3 9.5 1: 24 7.0 1:21/2: 5 6.0 1: 36 5.0 12.0 9.0 7.5 6.0 The cost of cement (40kg per bag) = 240 per bag. The cost of sand is P 740 per cubic meter. The cost of gravel is 2000 per cubic meter. DO NOT Round off the quantity of bags for cement. Round off only in your final answer to two decimal places. Sand cu.m. .50 .50 .50 50 Gravel cu.m. 1.0 1.0 1.0 1.0

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Estimate the total amount of cost (Php) for concrete works (class "A") based from the following given (F1, C1, and
Slab-on-Grade):
10-pcs of F1 (1.2m x 1.2m x 0.3 m)
10-pcs of C1 (0.37 m x 0.4 m x 3.8 m)
Floor area of 100mm thk slab-on-grade = 51 sq.m
Class
AA
A
B
C
TABLE 1-2 CONCRETE PROPORTION
Cement
Mixture 40 kg. /Bag 50 kg. / Bag
9.5
7.0
6.0
5.0
1:11/2: 3
1:24
1:21/2: 5
1: 3 : 6
12.0
9.0
7.5
6.0
(40kg per bag) = 240 per bag.
740 per cubic meter.
The cost of cement
The cost of sand is
The cost of gravel is
2000 per cubic meter.
DO NOT Round off the quantity of bags for cement.
Round off only in your final answer to two decimal places.
Sand
cu.m.
.50
.50
.50
.50
Gravel
cu.m.
1.0
1.0
1.0
1.0
Transcribed Image Text:Estimate the total amount of cost (Php) for concrete works (class "A") based from the following given (F1, C1, and Slab-on-Grade): 10-pcs of F1 (1.2m x 1.2m x 0.3 m) 10-pcs of C1 (0.37 m x 0.4 m x 3.8 m) Floor area of 100mm thk slab-on-grade = 51 sq.m Class AA A B C TABLE 1-2 CONCRETE PROPORTION Cement Mixture 40 kg. /Bag 50 kg. / Bag 9.5 7.0 6.0 5.0 1:11/2: 3 1:24 1:21/2: 5 1: 3 : 6 12.0 9.0 7.5 6.0 (40kg per bag) = 240 per bag. 740 per cubic meter. The cost of cement The cost of sand is The cost of gravel is 2000 per cubic meter. DO NOT Round off the quantity of bags for cement. Round off only in your final answer to two decimal places. Sand cu.m. .50 .50 .50 .50 Gravel cu.m. 1.0 1.0 1.0 1.0
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 4 images

Blurred answer
Knowledge Booster
Construction process
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning