Develop the Pert model for the following tables. (The first are the nodes, in the
second they must be built)
Activity
Precedence
Node
Time
A
1-2
12
В
1-3
13
C
1-4
16
D
A
2-5
15
B
3-5
9
F
B
3-6
13
G
4-6
8
H
4-7
7
I
D, E
5-8
10
F, G
F, G
6-8
11
K
6-9
10
L
H
7-9
10
M
К, L
9-10
9.
I,J
8-10
12
М, N
М, N
10-12
10
10-11
9.
11-13
7
R
12-13
6.
Activity
Precedence
Time
A
8.
B
9.
10
E
B.
7
F
B
9.
G
B
6
H
C
9.
DE
11
Transcribed Image Text:Develop the Pert model for the following tables. (The first are the nodes, in the second they must be built) Activity Precedence Node Time A 1-2 12 В 1-3 13 C 1-4 16 D A 2-5 15 B 3-5 9 F B 3-6 13 G 4-6 8 H 4-7 7 I D, E 5-8 10 F, G F, G 6-8 11 K 6-9 10 L H 7-9 10 M К, L 9-10 9. I,J 8-10 12 М, N М, N 10-12 10 10-11 9. 11-13 7 R 12-13 6. Activity Precedence Time A 8. B 9. 10 E B. 7 F B 9. G B 6 H C 9. DE 11
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,