Determine the objectives of the nonconforming charts? Dotermine trial control limits and revised limits for each subgroup. Assume that any out-of- control points have assignable causes. Control limits arc to bc cstablished based on the average number inspected from the information. What are thesc control limits and the central line?

Solid Waste Engineering
3rd Edition
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Worrell, William A.
Chapter3: Collection
Section: Chapter Questions
Problem 3.9P
icon
Related questions
Question
Qn.1 Daily inspection results for the model 305 electric range assembly line are given in the following
table and answer the following questions. Take assumptions where applicable,
a) Determine the objcctives of the nonconforming charts?
b) Dotermine trial control limits and revised limits for each subgroup. Assume that any out-of-
control points have assignable causes.
c) Control limits arc to be cstablished based on the average number inspected from the information.
What are thesc control limits and the central line?
d) Detcrminc if the process is stable?
c) Find the process capability of the charts?
Date and
Shift
Number
Number
Date and
Number
Number
Inspected
Nonconforming
Shift
Inspected
Nonconforming
Nov. 8 I
171
31
Nov. 17 I
165
16
II
167
II
170
35
170
8
181
175
12
II
135
13
II
167
101
137
26
191
141
50
26
30
3
170
II
159
45
221
181
16
II
155
11
II
195
38
12I
195
30
23I
165
33
21
II
241
II
180
36
140
151
181
38
162
18
33
II
191
22
115
139
16
251
II
161
165
26
181
27
II
189
15
Transcribed Image Text:Qn.1 Daily inspection results for the model 305 electric range assembly line are given in the following table and answer the following questions. Take assumptions where applicable, a) Determine the objcctives of the nonconforming charts? b) Dotermine trial control limits and revised limits for each subgroup. Assume that any out-of- control points have assignable causes. c) Control limits arc to be cstablished based on the average number inspected from the information. What are thesc control limits and the central line? d) Detcrminc if the process is stable? c) Find the process capability of the charts? Date and Shift Number Number Date and Number Number Inspected Nonconforming Shift Inspected Nonconforming Nov. 8 I 171 31 Nov. 17 I 165 16 II 167 II 170 35 170 8 181 175 12 II 135 13 II 167 101 137 26 191 141 50 26 30 3 170 II 159 45 221 181 16 II 155 11 II 195 38 12I 195 30 23I 165 33 21 II 241 II 180 36 140 151 181 38 162 18 33 II 191 22 115 139 16 251 II 161 165 26 181 27 II 189 15
Expert Solution
steps

Step by step

Solved in 8 steps with 5 images

Blurred answer
Knowledge Booster
Dimensional homogeneity
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Solid Waste Engineering
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning