Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Average 31 35.5 31 40.5 34 39 37.5 time for Total process Average 15 20 17 18 24 time for Moulding Average 4.5 7 7 5.5 time for finishing Average time for 10 11 9. 8.5 10 8 12 packing Factory manager claims that there is a positive relationship between moulding time and total time taken for the process. As the production engineer you need to test this hypothesis using the above data. If there is a relationship, provide the best fitted straight line for the above data using linear regression. You should interpret your results in a method that can be understood by a non-technical audience. 20 25

MATLAB: An Introduction with Applications
6th Edition
ISBN:9781119256830
Author:Amos Gilat
Publisher:Amos Gilat
Chapter1: Starting With Matlab
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
A production line of a mechanical spare part includes three stages such as moulding, finishing
and packing. As the production engineer, you are required to improve the efficiency of the
process immediately to cater a relatively large order which needs to be served in a limited time.
On the shutdown day you only have resources and time to do detailed maintenance in only one
component. In order to do that you are required to identify the component(stage) which affect
the most to the total time consumed. Following details were obtained in a cycle time analysis
of most recent week. Using these details find the most significant component by performing a
correlation analysis.
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Average
31
35.5
31
40.5
34
39
37.5
time for
Total
process
Average
15
20
17
25
18
24
20
time for
Moulding
Average
4.5
7
6.
7
5.5
time for
finishing
Average
10
11
9.
8.5
10
12
time for
packing
Factory manager claims that there is a positive relationship between moulding time and total
time taken for the process. As the production engineer you need to test this hypothesis using
the above data. If there is a relationship, provide the best fitted straight line for the above data
using linear regression.
You should interpret your results in a method that can be understood by a non-technical
audience.
co
Transcribed Image Text:A production line of a mechanical spare part includes three stages such as moulding, finishing and packing. As the production engineer, you are required to improve the efficiency of the process immediately to cater a relatively large order which needs to be served in a limited time. On the shutdown day you only have resources and time to do detailed maintenance in only one component. In order to do that you are required to identify the component(stage) which affect the most to the total time consumed. Following details were obtained in a cycle time analysis of most recent week. Using these details find the most significant component by performing a correlation analysis. Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Average 31 35.5 31 40.5 34 39 37.5 time for Total process Average 15 20 17 25 18 24 20 time for Moulding Average 4.5 7 6. 7 5.5 time for finishing Average 10 11 9. 8.5 10 12 time for packing Factory manager claims that there is a positive relationship between moulding time and total time taken for the process. As the production engineer you need to test this hypothesis using the above data. If there is a relationship, provide the best fitted straight line for the above data using linear regression. You should interpret your results in a method that can be understood by a non-technical audience. co
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
Recommended textbooks for you
MATLAB: An Introduction with Applications
MATLAB: An Introduction with Applications
Statistics
ISBN:
9781119256830
Author:
Amos Gilat
Publisher:
John Wiley & Sons Inc
Probability and Statistics for Engineering and th…
Probability and Statistics for Engineering and th…
Statistics
ISBN:
9781305251809
Author:
Jay L. Devore
Publisher:
Cengage Learning
Statistics for The Behavioral Sciences (MindTap C…
Statistics for The Behavioral Sciences (MindTap C…
Statistics
ISBN:
9781305504912
Author:
Frederick J Gravetter, Larry B. Wallnau
Publisher:
Cengage Learning
Elementary Statistics: Picturing the World (7th E…
Elementary Statistics: Picturing the World (7th E…
Statistics
ISBN:
9780134683416
Author:
Ron Larson, Betsy Farber
Publisher:
PEARSON
The Basic Practice of Statistics
The Basic Practice of Statistics
Statistics
ISBN:
9781319042578
Author:
David S. Moore, William I. Notz, Michael A. Fligner
Publisher:
W. H. Freeman
Introduction to the Practice of Statistics
Introduction to the Practice of Statistics
Statistics
ISBN:
9781319013387
Author:
David S. Moore, George P. McCabe, Bruce A. Craig
Publisher:
W. H. Freeman