Conspicuous Limo uses activity-based costing for its two models of stretch Hummer limousines: Big and Too Big. There are three activity cost pools related to production, with estimated costs and expected activity as follows: Amount of Activity Activity Cost Pool Estimated Cost Activity cost driver Big Too Big Fabrication $181,500 Labor hours 600 500 Painting $650,000 Machine hours 1,600 300 Finishing $2,750,000 Units 470 530 Using the activity proportion method, how much of the finishing cost would be assigned to the Too Big model?
Process Costing
Process costing is a sort of operation costing which is employed to determine the value of a product at each process or stage of producing process, applicable where goods produced from a series of continuous operations or procedure.
Job Costing
Job costing is adhesive costs of each and every job involved in the production processes. It is an accounting measure. It is a method which determines the cost of specific jobs, which are performed according to the consumer’s specifications. Job costing is possible only in businesses where the production is done as per the customer’s requirement. For example, some customers order to manufacture furniture as per their needs.
ABC Costing
Cost Accounting is a form of managerial accounting that helps the company in assessing the total variable cost so as to compute the cost of production. Cost accounting is generally used by the management so as to ensure better decision-making. In comparison to financial accounting, cost accounting has to follow a set standard ad can be used flexibly by the management as per their needs. The types of Cost Accounting include – Lean Accounting, Standard Costing, Marginal Costing and Activity Based Costing.
Conspicuous Limo uses activity-based costing for its two models of stretch Hummer limousines: Big and Too Big. There are three activity cost pools related to production, with estimated costs and expected activity as follows:
Amount of Activity | ||||
Activity Cost Pool | Estimated Cost | Activity cost driver | Big | Too Big |
Fabrication | $181,500 | Labor hours | 600 | 500 |
Painting | $650,000 | Machine hours | 1,600 | 300 |
Finishing | $2,750,000 | Units | 470 | 530 |
Using the activity proportion method, how much of the finishing cost would be assigned to the Too Big model?
Trending now
This is a popular solution!
Step by step
Solved in 2 steps