Complete the unit cost table shown below for each component. NOTE: pay careful attention to the units. Put any assumptions or notes in an additional column to the right of your table.
Complete the unit cost table shown below for each component. NOTE: pay careful attention to the units. Put any assumptions or notes in an additional column to the right of your table.
Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter16: Budget Estimating
Section: Chapter Questions
Problem 4RQ: Prepare a typical bay estimate based on the following information: a. Bay size of 350 feet and a...
Related questions
Question
Complete the unit cost table shown below for each component. NOTE: pay careful attention to
the units. Put any assumptions or notes in an additional column to the right of your table.
![Part 2
Complete the unit cost table shown below for each component. NOTE: pay careful attention to
the units. Put any assumptions or notes in an additional column to the right of your table.
Office Building, 30,000 sf, 3-story, 8 ft walls, Assume 10,000 per floor
System/Component
Specification
Unit
Foundation
Piers and footings
Slab on grade
Excavation
Exterior Closure
Exterior walls
Elevated floor
Roof
Exterior doors
Exterior windows
Interior Work
Partition walls
Interior doors
Wall finishes
Floor finishes
Ceiling finishes
Mechanical
Plumbing
Heating/Cooling
Fire protection
Electrical
Service/distribution
Lighting & Wiring
Special Electrical
Poured concrete footings
Concrete, grading, and fill
Excavation and backfill
Concrete block (70% of floor area)
Concrete, precast double tees
Concrete, precast double tees
Wood/glass (1,250 sf ground/door)
Aluminum/glass (300 sf flr/window)
Studs/gyp board (6 sf flr/lf partition)
Hollow core (75 sf floor/door)
Paint interior walls
Carpet
Suspended acoustic ceiling
Fixtures/feeds (160 sf flr/fixture)
HVAC System
Sprinkler system
400 amp, panel boad, leads
Fixtures, feeds, switches, wiring
Alarm system
sf ground
sf slab
sf ground
sf wall
sf floor
sf roof
each.
each
If wall
each
sf wall
sy floor
sf ceiling
each
sf floor
sf floor
Unit Cost
$
$
$
4.36
6.95
2.75
$ 12.27
$ 9.96
$ 14.55
ist es s
?
?
?
$ 2,145.00
?
$ 724.00 ?
$ 11.25 ?
$260.00
?
?
?
2.58 ?
$ 1.25
$ 37.98
$
$ 1,450.00
$ 14.15
$
1.98
Cost per sf
sf floor
$
sf floor
$
sf floor $
Subtotal of system/components:
Add 22% for overhead and profit:
Total building cost=
?
?
?
5.47
15.82
0.83
?
?
?
?
?
?](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F75a79e0f-56af-4c2f-9024-15cc3332843c%2F06436e99-f9e9-4e90-96d3-2d2b9c9fc8b1%2Frlkmema_processed.jpeg&w=3840&q=75)
Transcribed Image Text:Part 2
Complete the unit cost table shown below for each component. NOTE: pay careful attention to
the units. Put any assumptions or notes in an additional column to the right of your table.
Office Building, 30,000 sf, 3-story, 8 ft walls, Assume 10,000 per floor
System/Component
Specification
Unit
Foundation
Piers and footings
Slab on grade
Excavation
Exterior Closure
Exterior walls
Elevated floor
Roof
Exterior doors
Exterior windows
Interior Work
Partition walls
Interior doors
Wall finishes
Floor finishes
Ceiling finishes
Mechanical
Plumbing
Heating/Cooling
Fire protection
Electrical
Service/distribution
Lighting & Wiring
Special Electrical
Poured concrete footings
Concrete, grading, and fill
Excavation and backfill
Concrete block (70% of floor area)
Concrete, precast double tees
Concrete, precast double tees
Wood/glass (1,250 sf ground/door)
Aluminum/glass (300 sf flr/window)
Studs/gyp board (6 sf flr/lf partition)
Hollow core (75 sf floor/door)
Paint interior walls
Carpet
Suspended acoustic ceiling
Fixtures/feeds (160 sf flr/fixture)
HVAC System
Sprinkler system
400 amp, panel boad, leads
Fixtures, feeds, switches, wiring
Alarm system
sf ground
sf slab
sf ground
sf wall
sf floor
sf roof
each.
each
If wall
each
sf wall
sy floor
sf ceiling
each
sf floor
sf floor
Unit Cost
$
$
$
4.36
6.95
2.75
$ 12.27
$ 9.96
$ 14.55
ist es s
?
?
?
$ 2,145.00
?
$ 724.00 ?
$ 11.25 ?
$260.00
?
?
?
2.58 ?
$ 1.25
$ 37.98
$
$ 1,450.00
$ 14.15
$
1.98
Cost per sf
sf floor
$
sf floor
$
sf floor $
Subtotal of system/components:
Add 22% for overhead and profit:
Total building cost=
?
?
?
5.47
15.82
0.83
?
?
?
?
?
?
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
![Fundamentals Of Construction Estimating](https://www.bartleby.com/isbn_cover_images/9781337399395/9781337399395_smallCoverImage.gif)
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
![Architectural Drafting and Design (MindTap Course…](https://www.bartleby.com/isbn_cover_images/9781285165738/9781285165738_smallCoverImage.gif)
Architectural Drafting and Design (MindTap Course…
Civil Engineering
ISBN:
9781285165738
Author:
Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:
Cengage Learning
![Fundamentals Of Construction Estimating](https://www.bartleby.com/isbn_cover_images/9781337399395/9781337399395_smallCoverImage.gif)
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
![Architectural Drafting and Design (MindTap Course…](https://www.bartleby.com/isbn_cover_images/9781285165738/9781285165738_smallCoverImage.gif)
Architectural Drafting and Design (MindTap Course…
Civil Engineering
ISBN:
9781285165738
Author:
Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:
Cengage Learning