CHAPTER 3, Part 1 - Problem 2: A new one-way on-ramp will be constructed from US-460 to Southgate Dr south in Blacksburg and will consist of a combined sag and crest curve with a design speed of 45 mph. The combined crest and sag curve connects a 0% grade to a +2.0 grade and meets at a -3% common grade. For this project, PVC CREST is at Station 0+00.0. For the crest curve, check the last two paragraphs of section 3.3.3 in the text. (A) Calculate the following values: о Acrest, Lmincrest, ASAG, LminSAG, Total Lmin о PVC CREST, PVI CREST, PVT CREST, PVCSAG, PVISAG, PVT SAG (note that PVC, PVI, and PVT values are in stations) (B) Label the following variables and given/calculated values (ie PVCcrest = 0+00.0) on the figure below. Note that the diagram is exaggerated and not to scale. (You can download the png file here)✓ For Crest curve: . PVC, PVI, PVT G1 and G2 . Lmin For Sag curve: PVC, PVI, PVT . G1 and G2 Lmin For total combined curve: о Lmin TOTAL height Begnning of combined curve End of combined curve • Calculate the stations of the lowest and highest points on the combined curve 。 Calculate the height difference between PVCCREST and PVTSAG. (C) Thinking about Stopping Sight Distance (SSD), answer the following: 。 Determine what the design SSD is for the combined curve. • Is the length of the combined curve greater or less than SSD? To be conservative, which would you use?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Question
CHAPTER 3, Part 1 - Problem 2:
A new one-way on-ramp will be constructed from US-460 to Southgate Dr south in Blacksburg and will consist of a combined sag and crest curve with
a design speed of 45 mph. The combined crest and sag curve connects a 0% grade to a +2.0 grade and meets at a -3% common grade. For this project,
PVC CREST is at Station 0+00.0. For the crest curve, check the last two paragraphs of section 3.3.3 in the text.
(A) Calculate the following values:
о
Acrest, Lmincrest, ASAG, LminSAG, Total Lmin
о
PVC CREST, PVI CREST, PVT CREST, PVCSAG, PVISAG, PVT SAG (note that PVC, PVI, and PVT values are in stations)
(B) Label the following variables and given/calculated values (ie PVCcrest = 0+00.0) on the figure below. Note that the diagram is exaggerated and not
to scale. (You can download the png file here)✓
For Crest curve:
.
PVC, PVI, PVT
G1 and G2
.
Lmin
For Sag curve:
PVC, PVI, PVT
.
G1 and G2
Lmin
For total combined curve:
о
Lmin TOTAL
height
Begnning of combined curve
End of combined curve
• Calculate the stations of the lowest and highest points on the combined curve
。 Calculate the height difference between PVCCREST and PVTSAG.
(C) Thinking about Stopping Sight Distance (SSD), answer the following:
。 Determine what the design SSD is for the combined curve.
• Is the length of the combined curve greater or less than SSD? To be conservative, which would you use?
Transcribed Image Text:CHAPTER 3, Part 1 - Problem 2: A new one-way on-ramp will be constructed from US-460 to Southgate Dr south in Blacksburg and will consist of a combined sag and crest curve with a design speed of 45 mph. The combined crest and sag curve connects a 0% grade to a +2.0 grade and meets at a -3% common grade. For this project, PVC CREST is at Station 0+00.0. For the crest curve, check the last two paragraphs of section 3.3.3 in the text. (A) Calculate the following values: о Acrest, Lmincrest, ASAG, LminSAG, Total Lmin о PVC CREST, PVI CREST, PVT CREST, PVCSAG, PVISAG, PVT SAG (note that PVC, PVI, and PVT values are in stations) (B) Label the following variables and given/calculated values (ie PVCcrest = 0+00.0) on the figure below. Note that the diagram is exaggerated and not to scale. (You can download the png file here)✓ For Crest curve: . PVC, PVI, PVT G1 and G2 . Lmin For Sag curve: PVC, PVI, PVT . G1 and G2 Lmin For total combined curve: о Lmin TOTAL height Begnning of combined curve End of combined curve • Calculate the stations of the lowest and highest points on the combined curve 。 Calculate the height difference between PVCCREST and PVTSAG. (C) Thinking about Stopping Sight Distance (SSD), answer the following: 。 Determine what the design SSD is for the combined curve. • Is the length of the combined curve greater or less than SSD? To be conservative, which would you use?
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning