CECE 3223 Construction Measurement -IV Problem Set: 1 a. Estimate the quantity of earthwork for a portion of road from the following data: Chainage 1 3 4 5 6. 7 9. Reduced 7.50 7.70 7.50 7.25 6.85 6.95 6.70 6.45 6.30 5.95 Level The formation level at chainage 0 is 8.00 m and having falling gradient of 1 in 100.The top width is 12.00 m and side slopes 1½ horizontal to 1 vertical assuming the transverse direction is in level. Calculate the quantity of earth work by using Trapezoidal & Prismoidal formula. Take 1 chain length = 20.00 m. %3D Reduced Reduced Bd Sd? Bd+Sd? D Chainage Distance level of level of (m) Ground(m) Formation(m) (m²) (m²) (m?) 7.50 1 20 7.70 40 7.50 2.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
100%
CECE 3223 Construction Measurement-IV
Problem Set: 1
a. Estimate the quantity of earthwork for a portion of road from the following data:
Chainage
1
3
4
5
6
8
9
Reduced
7.50
7.70
7.50
7.25
6.85
6.95
6.70
6.45
6.30
5.95
Level
The formation level at chainage 0 is 8.00 m and having falling gradient of 1 in 100.The top width
is 12.00 m and side slopes 12 horizontal to 1 vertical assuming the transverse direction is in level.
Calculate the quantity of earth work by using Trapezoidal & Prismoidal formula.
Take 1 chain length = 20.00 m.
Reduced
Reduced
Bd
Sd?
Bd+Sd?
Chainage Distance
level of
level of
(m)
Ground(m) Formation(m)
(m²)
(m²)
(m²)
7.50
1
20
7.70
40
7.50
3
60
7.25
4
80
6.85
100
6.95
6.
120
6.70
7
140
6.45
8.
160
6.30
9
180
5.95
10
2.
Transcribed Image Text:CECE 3223 Construction Measurement-IV Problem Set: 1 a. Estimate the quantity of earthwork for a portion of road from the following data: Chainage 1 3 4 5 6 8 9 Reduced 7.50 7.70 7.50 7.25 6.85 6.95 6.70 6.45 6.30 5.95 Level The formation level at chainage 0 is 8.00 m and having falling gradient of 1 in 100.The top width is 12.00 m and side slopes 12 horizontal to 1 vertical assuming the transverse direction is in level. Calculate the quantity of earth work by using Trapezoidal & Prismoidal formula. Take 1 chain length = 20.00 m. Reduced Reduced Bd Sd? Bd+Sd? Chainage Distance level of level of (m) Ground(m) Formation(m) (m²) (m²) (m²) 7.50 1 20 7.70 40 7.50 3 60 7.25 4 80 6.85 100 6.95 6. 120 6.70 7 140 6.45 8. 160 6.30 9 180 5.95 10 2.
Expert Solution
steps

Step by step

Solved in 4 steps with 4 images

Blurred answer
Knowledge Booster
Volumes
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning