Calculate number of transit mixers (TM) required for transporting concrete from central batching plant to site. The cycle time data of a 6 m³ typical transit mixer is given below: Loading time of TM = 6.0 minutes Travel time of loaded TM to site = 30.0 minutes Average waiting time at site = 5.0 minutes Discharge time of concrete at site through concrete pump = 15 minutes Travel time for return trip = 24 minutes If the central batching plant having average output of 60 m³/hr is to run continuously, work out the requirement of no. of concrete pumps and TM.
Calculate number of transit mixers (TM) required for transporting concrete from central batching plant to site. The cycle time data of a 6 m³ typical transit mixer is given below: Loading time of TM = 6.0 minutes Travel time of loaded TM to site = 30.0 minutes Average waiting time at site = 5.0 minutes Discharge time of concrete at site through concrete pump = 15 minutes Travel time for return trip = 24 minutes If the central batching plant having average output of 60 m³/hr is to run continuously, work out the requirement of no. of concrete pumps and TM.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
Please hurry
![Calculate number of transit mixers (TM) required for transporting concrete from central batching
plant to site. The cycle time data of a 6 m³ typical transit mixer is given below:
Loading time of TM = 6.0 minutes
Travel time of loaded TM to site =
30.0 minutes
Average waiting time at site = 5.0 minutes
Discharge time of concrete at site through concrete pump = 15 minutes
Travel time for return trip = 24 minutes
If the central batching plant having average output of 60 m³/hr is to run continuously, work out
the requirement of no. of concrete pumps and TM.](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2Fd6ee999d-2b2c-493e-8f4f-40cf5bc96c4d%2F22365227-3b95-4b3d-ab41-a57fb4e1a53f%2Fbrmnof_processed.jpeg&w=3840&q=75)
Transcribed Image Text:Calculate number of transit mixers (TM) required for transporting concrete from central batching
plant to site. The cycle time data of a 6 m³ typical transit mixer is given below:
Loading time of TM = 6.0 minutes
Travel time of loaded TM to site =
30.0 minutes
Average waiting time at site = 5.0 minutes
Discharge time of concrete at site through concrete pump = 15 minutes
Travel time for return trip = 24 minutes
If the central batching plant having average output of 60 m³/hr is to run continuously, work out
the requirement of no. of concrete pumps and TM.
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 2 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Fundamentals of Structural Analysis](https://www.bartleby.com/isbn_cover_images/9780073398006/9780073398006_smallCoverImage.gif)
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781337551663/9781337551663_smallCoverImage.gif)
![Traffic and Highway Engineering](https://www.bartleby.com/isbn_cover_images/9781305156241/9781305156241_smallCoverImage.jpg)
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning