CalcIt produces a line of inexpensive pocket calculators. One model, IT53, is a solar- powered scientific model with a liquid crystal display (LCD). The calculator is pic- tured in Figure 8–11. Each calculator requires four solar cells, 40 buttons, one LCD display, and one main processor. All parts are ordered from outside suppliers, but final assembly is done FIGURE 8–11 CalcIt Model IT53 Scientific Calculator Solar batteries (Problem 41) 2.2235 LCD display by CalcIt. The processors must be in stock three weeks before the anticipated comple- tion date of a batch of calculators to allow enough time to set the processor in the cas- ing, connect the appropriate wiring, and allow the setting paste to dry. The buttons must be in stock two weeks in advance and are set by hand into the calculators. The CSR |1/x % OFF ON Buttons VX X2 2ND INV SIN COS TAN DRG LCD displays and the solar cells are ordered from the same supplier and need to be in EE |LOG In stock one week in advance. S+ K Based on firm orders that Calclt has obtained, the master production schedule for IT53 for a 10-week period starting at week 8 is given by X STD 8 sh-1 5 sh Week 8 9 10 11 12 13 14 15 16 17 MPS 1,200 1,200 800 1,000 1,000 300 2,200 1,400 1,800 600 EXC Determine the gross requirements schedule for the solar cells, the buttons, the LCD display, and the main processor chips.
CalcIt produces a line of inexpensive pocket calculators. One model, IT53, is a solar- powered scientific model with a liquid crystal display (LCD). The calculator is pic- tured in Figure 8–11. Each calculator requires four solar cells, 40 buttons, one LCD display, and one main processor. All parts are ordered from outside suppliers, but final assembly is done FIGURE 8–11 CalcIt Model IT53 Scientific Calculator Solar batteries (Problem 41) 2.2235 LCD display by CalcIt. The processors must be in stock three weeks before the anticipated comple- tion date of a batch of calculators to allow enough time to set the processor in the cas- ing, connect the appropriate wiring, and allow the setting paste to dry. The buttons must be in stock two weeks in advance and are set by hand into the calculators. The CSR |1/x % OFF ON Buttons VX X2 2ND INV SIN COS TAN DRG LCD displays and the solar cells are ordered from the same supplier and need to be in EE |LOG In stock one week in advance. S+ K Based on firm orders that Calclt has obtained, the master production schedule for IT53 for a 10-week period starting at week 8 is given by X STD 8 sh-1 5 sh Week 8 9 10 11 12 13 14 15 16 17 MPS 1,200 1,200 800 1,000 1,000 300 2,200 1,400 1,800 600 EXC Determine the gross requirements schedule for the solar cells, the buttons, the LCD display, and the main processor chips.
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
Recommended textbooks for you
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.