C) Two alternatives have been proposed to construct a new road project to improve capacity and safety. The table below explains each alternative's costs: the initial construction costs, annual operating and maintenance costs after the first year, and resurface of road costs. Assume that the annual interest rate is 5%. Determine the present worth for each alternative, then choose the preferred alternative based on the economic criteria. by present worth Alternative The initial construction costs The annual operating and maintenance costs The resurface costs Service life (years) 1 $4,000,000 $3,900 $850,000 (Every five years) 14 $3,800,000 $4,100 $800,000 (Every four years)

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
icon
Concept explainers
Question
C) Two alternatives have been proposed to construct a new road project to improve capacity and
safety. The table below explains each alternative's costs: the initial construction costs, annual
operating and maintenance costs after the first year, and resurface of road costs. Assume that the
annual interest rate is 5%. Determine the present worth for each alternative, then choose the
preferred alternative based on the economic criteria. by present worth
Alternative
The initial construction costs
The annual operating and maintenance costs
The resurface costs
Service life (years)
$4.000.000
$3.900
$850,000
(Every five years)
14
$3,800,000
$4,100
$800.000
(Every four years)
Transcribed Image Text:C) Two alternatives have been proposed to construct a new road project to improve capacity and safety. The table below explains each alternative's costs: the initial construction costs, annual operating and maintenance costs after the first year, and resurface of road costs. Assume that the annual interest rate is 5%. Determine the present worth for each alternative, then choose the preferred alternative based on the economic criteria. by present worth Alternative The initial construction costs The annual operating and maintenance costs The resurface costs Service life (years) $4.000.000 $3.900 $850,000 (Every five years) 14 $3,800,000 $4,100 $800.000 (Every four years)
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Evaluation of Transportation Projects
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning