Built-Tite uses job order costing. The T-account below summarizes Factory overhead activity for the current year. Factory Overhead Debit Credit 17,500 111,800 26,500 61, 500 1. Compute total applied overhead cost. 2. Compute total actual overhead cost. 3. Compute the underapplied or overapplied overhead. 1. Total applied overhead cost 2. Total actual overhead cost 3.
Process Costing
Process costing is a sort of operation costing which is employed to determine the value of a product at each process or stage of producing process, applicable where goods produced from a series of continuous operations or procedure.
Job Costing
Job costing is adhesive costs of each and every job involved in the production processes. It is an accounting measure. It is a method which determines the cost of specific jobs, which are performed according to the consumer’s specifications. Job costing is possible only in businesses where the production is done as per the customer’s requirement. For example, some customers order to manufacture furniture as per their needs.
ABC Costing
Cost Accounting is a form of managerial accounting that helps the company in assessing the total variable cost so as to compute the cost of production. Cost accounting is generally used by the management so as to ensure better decision-making. In comparison to financial accounting, cost accounting has to follow a set standard ad can be used flexibly by the management as per their needs. The types of Cost Accounting include – Lean Accounting, Standard Costing, Marginal Costing and Activity Based Costing.
Overhead :— It is the cost that are not directly incurred in the manufacturing of product during the period.
Applied Overhead :— It is the factory overhead cost that are applied to cost object.
Overapplied factory overhead :— It occurs when applied factory overhead is greater than actual factory overhead.
Underapplied Factory Overhead :— It occurs when actual factory overhead is greater than applied factory overhead.
Trending now
This is a popular solution!
Step by step
Solved in 5 steps