Average Time (min.) Defective (%) Average Time (min.) Defective (%) 21.6 3.1 20.8 2.7 22.5 4.6 18.9 4.5 23.1 24.6 2.7 21.4 2.8 1.8 23.7 1.9 22.8 3.5 23.8 1.1 23.7 3.2 24.9 1.2 20.9 3.7 19.8 2.3 19.7 4.5 19.7 5.1 24.5 0.8 21.2 3.6 26.7 1.2 20.8 4.2
Employees at Precision Engine Parts Company produce parts according to exact design specifications.
The employees are paid according to a piece-rate system, wherein the faster they work
and the more parts they produce, the greater their chances for monthly bonuses. Management
suspects that this method of pay may contribute to an increased number of defective parts. A
specific part requires a normal, standard time of 23 minutes to produce. The
has checked the actual average times to produce this part for 10 different employees during
20 days selected at random during the past month and determined the corresponding percentage
of defective parts, as follows: Develop a linear regression model relating average production time to percentage defects to determine
whether a relationship exists and the percentage of defective items that would be expected
with a normal production time of 23 minutes.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images