At a ready-mix concrete plant 65 tons of cement, 190 tons of fine aggregate, 250 tons of coarse aggregate and 50 tons of water are available before the end of the day. The plant manager knows that the next day (s)he has to deliver a total of 200 m of concrete. In the laboratory, the moisture content of sand and gravel was determined as 1.2 % and 0.2%, respectively and the absorption capacities are 0.8 % for both materials. SSD bulk specific gravities are 2.60 and 2.70 for sand and gravel, respectively. Specific gravity of cement is 3.15. Mix design based on field weight of aggregates: Ingredient Weight (kg/m³-concrete) Field Cement 350 Fine aggregate Coarse aggregate 750 950 Water 195 Calculate the maximum volume of concrete that can be produced with the available materials at the field. What should the plant manager do?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
icon
Concept explainers
Question
OAt a ready-mix concrete plant 65 tons of cement, 190 tons of fine aggregate, 250
tons of coarse aggregate and 50 tons of water are available before the end of the day.
The plant manager knows that the next day (s)he has to deliver a total of 200 m³ of concrete.
In the laboratory, the moisture content of sand and gravel was determined as 1.2 % and 0.2%,
respectively and the absorption capacities are 0.8 % for both materials.
SSD bulk specific gravities are 2.60 and 2.70 for sand and gravel, respectively.
Specific gravity of cement is 3.15.
Mix design based on field weight of aggregates:
Ingredient
Weight (kg/m2-concrete)
Field
Cement
350
Fine
aggregate
Coarse aggregate
750
950
Water
195
Calculate the maximum volume of concrete that can be produced with the available
materials at the field. What should the plant manager do?
[18 pts] 7) The grading of three aggregates is given below.
MONSTER
Transcribed Image Text:OAt a ready-mix concrete plant 65 tons of cement, 190 tons of fine aggregate, 250 tons of coarse aggregate and 50 tons of water are available before the end of the day. The plant manager knows that the next day (s)he has to deliver a total of 200 m³ of concrete. In the laboratory, the moisture content of sand and gravel was determined as 1.2 % and 0.2%, respectively and the absorption capacities are 0.8 % for both materials. SSD bulk specific gravities are 2.60 and 2.70 for sand and gravel, respectively. Specific gravity of cement is 3.15. Mix design based on field weight of aggregates: Ingredient Weight (kg/m2-concrete) Field Cement 350 Fine aggregate Coarse aggregate 750 950 Water 195 Calculate the maximum volume of concrete that can be produced with the available materials at the field. What should the plant manager do? [18 pts] 7) The grading of three aggregates is given below. MONSTER
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Pricing concrete work
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning