Assume you are the project manager and based on your customer's requirements you have determined there are four main tasks in a Dream Backyard project and have assigned each a TBC. Specifically, the customer wants the backyard leveled (Task 1 - $15,000); wants a covered outdoor kitchen with a hot tub and firepit (Task 2 - $20,000), a retaining wall with fencing built- in (Task 3- $25,000), and a pool with waterfall (Task 4- $60,000). You estimate this will take 5 weeks to complete. The costs are budgeted as follows: Budgeted Per Week (in 000's) TBC 1 2 3 4 5 Task 1 15 6 6 3 4 Task 2 20 2 3 10 4 1 Task 3 25 8 7 8 6 4 Task 4 60 10 25 20 5 What is the total cumulative TBC? What is TBC at the end of week 4? The total TBC is $120,000 The TBC at the end of the week 4 is $110,000 ssume 4 weeks have passed and these are the actual costs per week: Actual Costs Per Week (in 000's) 1 2 3 4 Task 1 12 5 3 Task 2 4 7 16 Task 3 10 5 Task 4 11 17 What is the CAC at the end of week 4? 4 6 15
Assume you are the project manager and based on your customer's requirements you have determined there are four main tasks in a Dream Backyard project and have assigned each a TBC. Specifically, the customer wants the backyard leveled (Task 1 - $15,000); wants a covered outdoor kitchen with a hot tub and firepit (Task 2 - $20,000), a retaining wall with fencing built- in (Task 3- $25,000), and a pool with waterfall (Task 4- $60,000). You estimate this will take 5 weeks to complete. The costs are budgeted as follows: Budgeted Per Week (in 000's) TBC 1 2 3 4 5 Task 1 15 6 6 3 4 Task 2 20 2 3 10 4 1 Task 3 25 8 7 8 6 4 Task 4 60 10 25 20 5 What is the total cumulative TBC? What is TBC at the end of week 4? The total TBC is $120,000 The TBC at the end of the week 4 is $110,000 ssume 4 weeks have passed and these are the actual costs per week: Actual Costs Per Week (in 000's) 1 2 3 4 Task 1 12 5 3 Task 2 4 7 16 Task 3 10 5 Task 4 11 17 What is the CAC at the end of week 4? 4 6 15
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
![Assume you are the project manager and based on your customer's requirements you have
determined there are four main tasks in a Dream Backyard project and have assigned each a TBC.
Specifically, the customer wants the backyard leveled (Task 1 $15,000); wants a covered
outdoor kitchen with a hot tub and firepit (Task 2 - $20,000), a retaining wall with fencing built-
in (Task 3-$25,000), and a pool with waterfall (Task 4- $60,000). You estimate this will take 5
weeks to complete. The costs are budgeted as follows:
Budgeted Per Week (in 000's)
TBC
1
2
3 4
5
Task 1
6
6
3
4
Task 2
2
3
10
4
1
8
7
8
6
4
Task 3 25
Task 4
60
10 25 20 5
What is the total cumulative TBC? What is TBC at the end of week 4?
The total TBC is $120,000
The TBC at the end of the week 4 is $110,000
ssume 4 weeks have passed and these are the actual costs per week:
Actual Costs Per Week (in 000's)
1
2
3
4
Task 1
12
5
3
Task 2
4
7
16
4
Task 3
10
5
Task 4
11
17
What is the CAC at the end of week 4?
1228
15
20
6
15](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F39b54221-c185-4333-90df-a35ec3241fc7%2F98f7e3f3-15af-4a71-bca3-5c6717248eec%2Fpeag7qk_processed.jpeg&w=3840&q=75)
Transcribed Image Text:Assume you are the project manager and based on your customer's requirements you have
determined there are four main tasks in a Dream Backyard project and have assigned each a TBC.
Specifically, the customer wants the backyard leveled (Task 1 $15,000); wants a covered
outdoor kitchen with a hot tub and firepit (Task 2 - $20,000), a retaining wall with fencing built-
in (Task 3-$25,000), and a pool with waterfall (Task 4- $60,000). You estimate this will take 5
weeks to complete. The costs are budgeted as follows:
Budgeted Per Week (in 000's)
TBC
1
2
3 4
5
Task 1
6
6
3
4
Task 2
2
3
10
4
1
8
7
8
6
4
Task 3 25
Task 4
60
10 25 20 5
What is the total cumulative TBC? What is TBC at the end of week 4?
The total TBC is $120,000
The TBC at the end of the week 4 is $110,000
ssume 4 weeks have passed and these are the actual costs per week:
Actual Costs Per Week (in 000's)
1
2
3
4
Task 1
12
5
3
Task 2
4
7
16
4
Task 3
10
5
Task 4
11
17
What is the CAC at the end of week 4?
1228
15
20
6
15
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Recommended textbooks for you
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
![Operations Management](https://www.bartleby.com/isbn_cover_images/9781259667473/9781259667473_smallCoverImage.gif)
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
![Operations and Supply Chain Management (Mcgraw-hi…](https://www.bartleby.com/isbn_cover_images/9781259666100/9781259666100_smallCoverImage.gif)
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
![Practical Management Science](https://www.bartleby.com/isbn_cover_images/9781337406659/9781337406659_smallCoverImage.gif)
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
![Operations Management](https://www.bartleby.com/isbn_cover_images/9781259667473/9781259667473_smallCoverImage.gif)
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
![Operations and Supply Chain Management (Mcgraw-hi…](https://www.bartleby.com/isbn_cover_images/9781259666100/9781259666100_smallCoverImage.gif)
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
![Business in Action](https://www.bartleby.com/isbn_cover_images/9780135198100/9780135198100_smallCoverImage.gif)
![Purchasing and Supply Chain Management](https://www.bartleby.com/isbn_cover_images/9781285869681/9781285869681_smallCoverImage.gif)
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
![Production and Operations Analysis, Seventh Editi…](https://www.bartleby.com/isbn_cover_images/9781478623069/9781478623069_smallCoverImage.gif)
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.