As the day shift supervisor at the steel plant, you summon the six college students who are working for you this summer doing whatever you need done (sweeping up, sandblasting the inside of boilers that are down for maintenance, running errands, etc.). You walk them across the plant to a field where the company stores scrap metal “leftovers.” The area, about the size of a football field, is stacked with organized piles of metal. You explain that everything they see has just been sold. Metal prices, which have been depressed, have finally risen enough that the company can earn a small profit by selling its scrap. You point out that railroad tracks divide the field into parallel sectors, like the lines on a football field, so that each stack of metal is no more than 15 feet from a track. Each stack contains 390 pieces of metal. Each piece weighs 92 pounds and is about a yard long and just over 4 inches high and 4 inches wide. You tell the students that working as a team, they are to pick up each piece, walk up a ramp to a railroad car, which will be positioned next to each stack, and then neatly position and stack the metal for shipment. That’s right, you repeat, 92 pounds, walk up the ramp, and carry the metal onto the rail car. Anticipating their questions, you explain that a forklift could be used only if the metal was stored on wooden pallets (it isn’t), if the pallets could withstand the weight of the metal (they would be crushed), and if you, as their supervisor, had forklifts and people trained to run them (you don’t). In other words, the only way to get the metal into the rail cars is for the students to carry it. Based on an old report from the last time the company sold some of the metal, you know that over an eight-hour shift workers typically loaded about 30 to 31 pieces of metal parts per hour. At that pace, though, it will take your six students six weeks to load all of the metal, and the purchasing manager who sold it says it must be shipped in two weeks. So, without more workers (there’s a hiring freeze) and without forklifts, all of the metal has to be loaded by hand by these six workers in two weeks. Which of the following approaches to management that have influenced how today’s managers produce goods and services would be most applicable to the shift supervisor’s problem? A. information management B. systems management C. operations management D. administrative management E. contingency management
-
As the day shift supervisor at the steel plant, you summon the six college students who are working for you this summer doing whatever you need done (sweeping up, sandblasting the inside of boilers that are down for maintenance, running errands, etc.). You walk them across the plant to a field where the company stores scrap metal “leftovers.” The area, about the size of a football field, is stacked with organized piles of metal. You explain that everything they see has just been sold. Metal prices, which have been depressed, have finally risen enough that the company can earn a small profit by selling its scrap.
You point out that railroad tracks divide the field into parallel sectors, like the lines on a football field, so that each stack of metal is no more than 15 feet from a track. Each stack contains 390 pieces of metal. Each piece weighs 92 pounds and is about a yard long and just over 4 inches high and 4 inches wide. You tell the students that working as a team, they are to pick up each piece, walk up a ramp to a railroad car, which will be positioned next to each stack, and then neatly position and stack the metal for shipment. That’s right, you repeat, 92 pounds, walk up the ramp, and carry the metal onto the rail car. Anticipating their questions, you explain that a forklift could be used only if the metal was stored on wooden pallets (it isn’t), if the pallets could withstand the weight of the metal (they would be crushed), and if you, as their supervisor, had forklifts and people trained to run them (you don’t). In other words, the only way to get the metal into the rail cars is for the students to carry it.
Based on an old report from the last time the company sold some of the metal, you know that over an eight-hour shift workers typically loaded about 30 to 31 pieces of metal parts per hour. At that pace, though, it will take your six students six weeks to load all of the metal, and the purchasing manager who sold it says it must be shipped in two weeks. So, without more workers (there’s a hiring freeze) and without forklifts, all of the metal has to be loaded by hand by these six workers in two weeks.
Which of the following approaches to management that have influenced how today’s managers produce goods and services would be most applicable to the shift supervisor’s problem?A. information management
B. systems management
C. operations management
D. administrative management
E. contingency management