As the day shift supervisor at the steel plant, you summon the six college students who are working for you this summer doing whatever you need done (sweeping up, sandblasting the inside of boilers that are down for maintenance, running errands, etc.). You walk them across the plant to a field where the company stores scrap metal “leftovers.” The area, about the size of a football field, is stacked with organized piles of metal. You explain that everything they see has just been sold. Metal prices, which have been depressed, have finally risen enough that the company can earn a small profit by selling its scrap. You point out that railroad tracks divide the field into parallel sectors, like the lines on a football field, so that each stack of metal is no more than 15 feet from a track. Each stack contains 390 pieces of metal. Each piece weighs 92 pounds and is about a yard long and just over 4 inches high and 4 inches wide. You tell the students that working as a team, they are to pick up each piece, walk up a ramp to a railroad car, which will be positioned next to each stack, and then neatly position and stack the metal for shipment. That’s right, you repeat, 92 pounds, walk up the ramp, and carry the metal onto the rail car. Anticipating their questions, you explain that a forklift could be used only if the metal was stored on wooden pallets (it isn’t), if the pallets could withstand the weight of the metal (they would be crushed), and if you, as their supervisor, had forklifts and people trained to run them (you don’t). In other words, the only way to get the metal into the rail cars is for the students to carry it. Based on an old report from the last time the company sold some of the metal, you know that over an eight-hour shift workers typically loaded about 30 to 31 pieces of metal parts per hour. At that pace, though, it will take your six students six weeks to load all of the metal, and the purchasing manager who sold it says it must be shipped in two weeks. So, without more workers (there’s a hiring freeze) and without forklifts, all of the metal has to be loaded by hand by these six workers in two weeks. Which of the following approaches to management that have influenced how today’s managers produce goods and services would be most applicable to the shift supervisor’s problem?   A. information management   B. systems management   C. operations management   D. administrative management   E. contingency management

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
  1. As the day shift supervisor at the steel plant, you summon the six college students who are working for you this summer doing whatever you need done (sweeping up, sandblasting the inside of boilers that are down for maintenance, running errands, etc.). You walk them across the plant to a field where the company stores scrap metal “leftovers.” The area, about the size of a football field, is stacked with organized piles of metal. You explain that everything they see has just been sold. Metal prices, which have been depressed, have finally risen enough that the company can earn a small profit by selling its scrap.

    You point out that railroad tracks divide the field into parallel sectors, like the lines on a football field, so that each stack of metal is no more than 15 feet from a track. Each stack contains 390 pieces of metal. Each piece weighs 92 pounds and is about a yard long and just over 4 inches high and 4 inches wide. You tell the students that working as a team, they are to pick up each piece, walk up a ramp to a railroad car, which will be positioned next to each stack, and then neatly position and stack the metal for shipment. That’s right, you repeat, 92 pounds, walk up the ramp, and carry the metal onto the rail car. Anticipating their questions, you explain that a forklift could be used only if the metal was stored on wooden pallets (it isn’t), if the pallets could withstand the weight of the metal (they would be crushed), and if you, as their supervisor, had forklifts and people trained to run them (you don’t). In other words, the only way to get the metal into the rail cars is for the students to carry it.

    Based on an old report from the last time the company sold some of the metal, you know that over an eight-hour shift workers typically loaded about 30 to 31 pieces of metal parts per hour. At that pace, though, it will take your six students six weeks to load all of the metal, and the purchasing manager who sold it says it must be shipped in two weeks. So, without more workers (there’s a hiring freeze) and without forklifts, all of the metal has to be loaded by hand by these six workers in two weeks.

    Which of the following approaches to management that have influenced how today’s managers produce goods and services would be most applicable to the shift supervisor’s problem?

      A.

    information management

      B.

    systems management

      C.

    operations management

      D.

    administrative management

      E.

    contingency management

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps

Blurred answer
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.