Appendix A - Project Information and Current Building Performance Chiller No 1 Project information Building name: Year Built: Site Area: Skunk Works Tower 2017 7,132 m² Gross Floor Area: Plot Ratio: Block: Storey: Average cooling load (weekdays): Average Air-con system efficiency: 32,000m² 4.5 Single block 12-storey, with open car park 560 RT 0.95 kW/RT Information on current energy efficiency No permanent measuring instrumentation to monitor the chilled-water system 8 nos. lifts (which includes 2 nos. of fire/service lifts) with destination control system, sleep mode and variable frequency motor drive No escalator in the building 90% of the office areas are air-conditioned Air-conditioning equipment list Equipment Description Quantity Refrigerant Capacity Remarks 1 R123 650RT VSD, certified by SGBC Chiller No 2 1 R134a 500RT VSD, certified by SGBC Chiller No 3 1 R134a 250RT VSD, certified by SGBC Chiller No 4 1 R134a 150RT VSD, certified by SGBC Chilled Water Pump 1 & 2 2 15kW (each) VSD Chilled Water Pump 3 1 5.5kW VSD Chilled Water Pump 4 1 3.5kW VSD Condenser Water Pump 1 1 55kW VSD Condenser Water Pump 2 1 37kW VSD Condenser Water Pump 3 & 4 Cooling Towers 2 19kW(each) VSD 4 7.5kW x 2 (each) VSD Air-distribution system Total Existing Total Air Flow Existing Motor Power Allowable nameplate motor Total Allowable Motor Power Equipment Rating Variable volume Constant volume Total (CMH) 11,000 9,000 20,000 (W/CMH) 0.74 (W) power (W/CMH) Rating (W) 8,140 0.74 8,140 0.47 4,230 0.47 4,230 12,370 12,370 Others Toilets and staircases: Pantries and lift lobbies: Carpark: Natural Ventilation Existing lighting schedule Mechanical Ventilation Mechanical ventilation with CO sensors Total Reference Total Existing Power Monthly Electricity Consumption (kWh) Spaces Estimated Area (m²) (SS530) Power Consumption (W) Consumption (W/m²) Months kWh Jan 616,000 Feb 642,000 Mar 670,000 Apr 536,000 May 556.000 Jun 638,000 Jul 512,000 Aug 559,000 Sep 513,000 Oct 432,000 Offices 24,000.00 475,000.00 15 Lobbies 2,600.00 20,000.00 10 Stairs 800.00 4,800.00 6 Corridors 1,200.00 18,000.00 10 Stores 650.00 4,500.00 10 Café 450.00 6,500.00 15 Toilet 500.00 7,500.00 14.8 Nov 551,000 Dec 467,000 Total 6,692,000
help me with this Question for revision purposes and as well with citation
The office building was built in year 2017 and has not obtained any Green Mark certification
before. The office building is occupied by a single tenant/entity. The building management team had
done an analysis of the building’s energy performance by extracting the data from the various
systems. The current performance and findings of the systems are listed in Appendix A.
The client is considering to have the building undergo retrofitting to improve the building’s energy performance.
The objective is to achieve Green Mark Gold Plus under the new Green Mark 2021 framework.
For part (a) below, you are to use Pathway 1: EUI for this.
(a) As part of the feasibility exercise, you are to interpret the current performance of the existing building based on the data available (Refer to Appendix A). You should then organise and present to the client how does the current building relate to the Energy Efficiency Section of GM: 2021. With the information above, demonstrate your ability to identify and recommend areas for improvement to comply to the pre-requisites for the Energy Efficiency Section of GM: 2021 for the building.
For part (b) below, you are to use Pathway 2: Fixed Metrics for this.
(b) Similar to the feasibility exercise above, you are to evaluate the current performance and findings of the existing building based on the data available (Refer to Appendix A), You should then organise and present to the client how does the current building relate to the Energy Efficiency Section of GM: 2021. Finally, demonstrate your ability to identify and recommend areas for improvement to comply to the pre-requisites for the Energy Efficiency Section of GM: 2021 for the building


Step by step
Solved in 2 steps









