An oil well has the following specifications• Tubing diameter = 2.875" • Flow rate = 500 bbl/d • GLR = 2 Mscf/bbl • Tubing head P. Pth = 480 psi Well Depth = 12000 ft Calculate Pwf at 50, 100, 200 and 400 STB/day. Plot Pwf vs Q and determine optimum production rate.
An oil well has the following specifications• Tubing diameter = 2.875" • Flow rate = 500 bbl/d • GLR = 2 Mscf/bbl • Tubing head P. Pth = 480 psi Well Depth = 12000 ft Calculate Pwf at 50, 100, 200 and 400 STB/day. Plot Pwf vs Q and determine optimum production rate.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
An oil well has the following specifications• Tubing diameter = 2.875" • Flow rate = 500 bbl/d • GLR = 2 Mscf/bbl • Tubing head P. Pth = 480 psi Well Depth = 12000 ft Calculate Pwf at 50, 100, 200 and 400 STB/day. Plot Pwf vs Q and determine optimum production rate.
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps
Recommended textbooks for you
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning