an industrial load consumes 100 kW at 0.707 pf lagging. The 60 Hz line voltage at the is load is 480/_0° v rms, The transmission-line resistance between the power company trans ormer and the load is 0.10. The power savings that could be obtained if the pf is changed to 0.94 lagging is kW (round off your numerical answer to one ecimal point)

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter2: Fundamentals
Section: Chapter Questions
Problem 2.31P: Consider two interconnected voltage sources connected by a line of impedance Z=jX, as shown in...
icon
Related questions
icon
Concept explainers
Question
An industrial load consumes 100 kW at 0.707 pf lagging. The 60-Hz line voltage at the is load is 480/_00 v rms, The transmission-line resistance between the power company trans
former and the load is 0.1Q. The power savings that could be obtained if the pf is changed to 0.94 lagging is
kW (round off your numerical answer to one
decimal point)
Transcribed Image Text:An industrial load consumes 100 kW at 0.707 pf lagging. The 60-Hz line voltage at the is load is 480/_00 v rms, The transmission-line resistance between the power company trans former and the load is 0.1Q. The power savings that could be obtained if the pf is changed to 0.94 lagging is kW (round off your numerical answer to one decimal point)
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 4 images

Blurred answer
Knowledge Booster
Transmission line parameter
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning