Activity No 400-44 Activity Site mobilization Oreler Materials Site clearance casting of columns freet colams. filling and Caption Slab Casting of floor) Frect latele Frect raging Site work Duration Immediate fxcavations of foundations 2 Suneys and measurements -инида обириби find C) The free float (ii) the total float MAL Clean Up Determine the critical path and 04²44574- B, E F F #

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Activity No
4000 440
Activity
Site mobilization
Oreler Materials
Site clearance
10
3
Excavations of foundations 2
Surveys
and measurements
S
10
casting of columns
freet colums
filling and Caption
or slab
Casting of floor)
Erect latek
Brect raging
Site work
Duration Immediate
MAL
Clean lip
Determine the critical path and
find
C) The free float
(ii) the total float.
TECNO
SPARK
7
5
-
043²44574-
B, E
F
F
#
Transcribed Image Text:Activity No 4000 440 Activity Site mobilization Oreler Materials Site clearance 10 3 Excavations of foundations 2 Surveys and measurements S 10 casting of columns freet colums filling and Caption or slab Casting of floor) Erect latek Brect raging Site work Duration Immediate MAL Clean lip Determine the critical path and find C) The free float (ii) the total float. TECNO SPARK 7 5 - 043²44574- B, E F F #
Activity No Activity
A
F
4905440 H²S
H
K
MAL
Site mobilization
Oreler Materials
Site clearance
find
10
3
fixcavations of foundlections 2
and measurements
S
Surveys
casting of columns
10
20
freet colams.
filling and Caption
Casting of floor stab
Erect latel
Fredraging
Site work
Duration Immediate
S
Clean Up
Determine the critical path and
CJ The free float
(i) the total float
5
4²445743
B,E
TECNO
OOO SPARK
Transcribed Image Text:Activity No Activity A F 4905440 H²S H K MAL Site mobilization Oreler Materials Site clearance find 10 3 fixcavations of foundlections 2 and measurements S Surveys casting of columns 10 20 freet colams. filling and Caption Casting of floor stab Erect latel Fredraging Site work Duration Immediate S Clean Up Determine the critical path and CJ The free float (i) the total float 5 4²445743 B,E TECNO OOO SPARK
Expert Solution
Step 1

Given data 

Civil Engineering homework question answer, step 1, image 1

Find critical path, total float and free float.

steps

Step by step

Solved in 2 steps with 3 images

Blurred answer
Knowledge Booster
System of units
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning