A)An intersection approach has a capacity of 1600 vph. What is the likely queue at the end of an hour if the 15 minute vehicle arrivals are 350, 500, 300, and 500? B) What is the cumulative lost time per hour if the lost time per phase is 4 seconds and the intersection operates as a 4 phase 120 second cycle? C) A queue of 200 veh. is built up waiting to get into a national park prior to open. How long it will take to clear the queue if each vehicle takes 15 seconds, yet veh. continue to arrive at 60 vph?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
A)An intersection approach has a capacity of 1600 vph. What
is the likely queue at the end of an hour if the 15 minute
vehicle arrivals are 350, 500, 300, and 500?
B) What is the cumulative lost time per hour if the lost time
per phase is 4 seconds and the intersection operates as a 4
phase 120 second cycle?
C) A queue of 200 veh. is built up waiting to get into a
national park prior to open. How long it will take to clear the
queue if each vehicle takes 15 seconds, yet veh. continue to
arrive at 60 vph?
D) The allocated effective green time across 3 phases if
critical volumes are 300, 200 and 100 vehicles respectively if
you have a 75 second cycle. Assume Y+AR = tl = 5 sec/
phase.
E) A roadway has an estimated density of 50 vpmpl. What
percent of time is a highway detector covered if the detector
is 5 ft long? Assume 28 ft veh length.
Transcribed Image Text:A)An intersection approach has a capacity of 1600 vph. What is the likely queue at the end of an hour if the 15 minute vehicle arrivals are 350, 500, 300, and 500? B) What is the cumulative lost time per hour if the lost time per phase is 4 seconds and the intersection operates as a 4 phase 120 second cycle? C) A queue of 200 veh. is built up waiting to get into a national park prior to open. How long it will take to clear the queue if each vehicle takes 15 seconds, yet veh. continue to arrive at 60 vph? D) The allocated effective green time across 3 phases if critical volumes are 300, 200 and 100 vehicles respectively if you have a 75 second cycle. Assume Y+AR = tl = 5 sec/ phase. E) A roadway has an estimated density of 50 vpmpl. What percent of time is a highway detector covered if the detector is 5 ft long? Assume 28 ft veh length.
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Intersection design
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning