A. For the splice connection shown in Figure 2(A), determine the maximum factored load, Pu. that can be applied; consider the strength of the bolts (shear and bearing) only. The plates are ASTM A36 (F and the bolts are 1-in.-diameter A325X (threads are excluded from shear plan) in standard (STD)...... Hint: Check the total bolt bearing capacity on the outside plates, total bolt bearing capacity on the inside plate, and total shear capacity of the bolt group. B. Determine the capacity of the connection shown in Figure 2(B) based on weld strength alone (i.e., ignore the base-metal shear strength). Electrodes are E70XX.I'

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Please help
A. For the splice connection shown in Figure 2(A), determine the maximum factored load, Pu, that can be
applied; consider the strength of the bolts (shear and bearing) only. The plates are ASTM A36 (F
and the bolts are 1-in.-diameter A325X (threads are excluded from shear plan) in standard (STD).
Hint: Check the total bolt bearing capacity on the outside plates, total bolt bearing capacity on the inside
plate, and total shear capacity of the bolt group.
B. Determine the capacity of the connection shown in Figure 2(B) based on weld strength alone (i.e., ignore
the base-metal shear strength). Electrodes are E70XX.
Figure 2(A):
½/2P-
½/2 P
STD hole.
for 1" bolt
½" plate
Figure 2(B):
3
³0 20
3"
0
2
3/4 plate
P
Transcribed Image Text:A. For the splice connection shown in Figure 2(A), determine the maximum factored load, Pu, that can be applied; consider the strength of the bolts (shear and bearing) only. The plates are ASTM A36 (F and the bolts are 1-in.-diameter A325X (threads are excluded from shear plan) in standard (STD). Hint: Check the total bolt bearing capacity on the outside plates, total bolt bearing capacity on the inside plate, and total shear capacity of the bolt group. B. Determine the capacity of the connection shown in Figure 2(B) based on weld strength alone (i.e., ignore the base-metal shear strength). Electrodes are E70XX. Figure 2(A): ½/2P- ½/2 P STD hole. for 1" bolt ½" plate Figure 2(B): 3 ³0 20 3" 0 2 3/4 plate P
Figure 2(B):
YV
4"
%" plate
19
Transcribed Image Text:Figure 2(B): YV 4" %" plate 19
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 6 steps with 25 images

Blurred answer
Knowledge Booster
Tension members
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning