A tin plant shows a functional layout that is formed by six departments. Machines are grouped together according to their processes. The routes between departments are made vertically or horizontally (not diagonally) as shown by the arrows in Figure 1. 2 S + 6 C Figure 1. Current layout Department 1. Drills 4 + 5 2. NC machine 4. Lathes 3. Reception and dispatch 5. Tool locker 3 1m 1 3 + S 1 1m Movements between departments 2 600 3 0 300 4 550 0 450 6. Packaging Figure 2. Estimated movements between departments 5 0 2300 0 2000 6 2500 0 3000 0 0 According to the number of monthly movements of materials between departments shown in Figure 2, propose a new layout that minimises the total distance travelled between departments by taking into account two constraints: 1. Reception and dispatch department should not be moved as it is currently located by the loading and unloading platform. 2. The department of lathes has a slab specially conditioned to support the weight of the lathes. In the event of relocation, it would require costly treatment and a minimum time of two months. Therefore, this option is not recommended
A tin plant shows a functional layout that is formed by six departments. Machines are grouped together according to their processes. The routes between departments are made vertically or horizontally (not diagonally) as shown by the arrows in Figure 1. 2 S + 6 C Figure 1. Current layout Department 1. Drills 4 + 5 2. NC machine 4. Lathes 3. Reception and dispatch 5. Tool locker 3 1m 1 3 + S 1 1m Movements between departments 2 600 3 0 300 4 550 0 450 6. Packaging Figure 2. Estimated movements between departments 5 0 2300 0 2000 6 2500 0 3000 0 0 According to the number of monthly movements of materials between departments shown in Figure 2, propose a new layout that minimises the total distance travelled between departments by taking into account two constraints: 1. Reception and dispatch department should not be moved as it is currently located by the loading and unloading platform. 2. The department of lathes has a slab specially conditioned to support the weight of the lathes. In the event of relocation, it would require costly treatment and a minimum time of two months. Therefore, this option is not recommended
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 5 steps with 6 images
Recommended textbooks for you
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.