A supplier ships goods from Richmond, VA to three market places in 3 cities (Chicago, IL; Athens, GA; St. Luis, MO). The supplier can ship every day, every other day, or every third day. There is a penalty of $0.30/cwt for each day delayed. Consolidating shipments allows for lower transportation costs from larger loads, but incurs penalty costs due to the delay. Shipment City Chicago, IL Athens, GA St. Luis, MO Total Transportation Rate (S/cwt) Weight/day 18,000 lb (180 cwt) 15,000 lb (150 cwt) 12,000 lb (120 cwt) 45,000 lb = 450 cwt Find what is the cost for the following: Shipping Every Day Shipping on the alternate Day (every two days) Shipping every three Day LTL < 50,000 lb 1.50 1.35 2.00 TL > 50000 lb 1.25 1.00 1.50

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
A supplier ships goods from Richmond, VA to three market places in 3 cities (Chicago, IL; Athens, GA;
St. Luis, MO). The supplier can ship every day, every other day, or every third day.
There is a penalty of $0.30/cwt for each day delayed.
Consolidating shipments allows for lower transportation costs from larger loads, but incurs penalty
costs due to the delay.
Transportation Rate
(S/cwt)
Shipment
City
Weight/day
LTL <
TL >
50,000 lb
50000 lb
Chicago, IL
18,000 lb (180 cwt)
1.50
1.25
Athens, GA
15,000 lb (150 cwt)
1.35
1.00
St. Luis, MO
12,000 lb (120 cwt)
2.00
1.50
Total
45,000 Ib = 450 cwt
Find what is the cost for the following:
Shipping Every Day
Shipping on the alternate Day (every two days)
Shipping every three Day
Transcribed Image Text:A supplier ships goods from Richmond, VA to three market places in 3 cities (Chicago, IL; Athens, GA; St. Luis, MO). The supplier can ship every day, every other day, or every third day. There is a penalty of $0.30/cwt for each day delayed. Consolidating shipments allows for lower transportation costs from larger loads, but incurs penalty costs due to the delay. Transportation Rate (S/cwt) Shipment City Weight/day LTL < TL > 50,000 lb 50000 lb Chicago, IL 18,000 lb (180 cwt) 1.50 1.25 Athens, GA 15,000 lb (150 cwt) 1.35 1.00 St. Luis, MO 12,000 lb (120 cwt) 2.00 1.50 Total 45,000 Ib = 450 cwt Find what is the cost for the following: Shipping Every Day Shipping on the alternate Day (every two days) Shipping every three Day
Expert Solution
steps

Step by step

Solved in 5 steps with 57 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,