A stream size of 150 lit./sec was released from the diversion headwork to irrigate a land of area 1.8 hectares. The stream size when measured at the delivery to the field channels is 120lit/sec. The stream continued for 8h hours. The effective root zone depth is 1.80m. The application losses in the field are estimated to be 440m. The depth of water penetration was 1.80m and 1.20m at the head and tail of the run respectively. The available water holding capacity of the soil is 21cm/m and irrigation was done at 60% depletion of A.M. Find Ec, Ef, Ea, Es and Ed. The stream size delivered to the plot was 100 lit./sec. Selution.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
100%
A stream size of 150 lit./sec was released from the diversion headwork to irrigate a
land of area 1.8 hectares. The stream size when measured at the delivery to the field
channels is 120lit/sec. The stream continued for 8h hours. The effective root zone
depth is 1.80m. The application losses in the field are estimated to be 440m. The
depth of water penetration was 1.80m and 1.20m at the head and tail of the run
respectively. The available water holding capacity of the soil is 21cm/m and irrigation
was done at 60% depletion of A.M. Find Ec, Ef, Ea, Es and Ed. The stream size
delivered to the plot was 100 lit./sec.
Solution
Transcribed Image Text:A stream size of 150 lit./sec was released from the diversion headwork to irrigate a land of area 1.8 hectares. The stream size when measured at the delivery to the field channels is 120lit/sec. The stream continued for 8h hours. The effective root zone depth is 1.80m. The application losses in the field are estimated to be 440m. The depth of water penetration was 1.80m and 1.20m at the head and tail of the run respectively. The available water holding capacity of the soil is 21cm/m and irrigation was done at 60% depletion of A.M. Find Ec, Ef, Ea, Es and Ed. The stream size delivered to the plot was 100 lit./sec. Solution
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Pricing excavation and backfill
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning