A raft foundation of 30 m x 25 m is proposed to be constructed at a depth of 8 m in a sand layer. A 25 m thick saturated clay layer exists 2 m below the base of the raft foundation. Below the clay layer, a dense sand layer exists at the site. A 25 mm thick undisturbed sample was collected from the mid-depth of the clay layer and tested in a laboratory oedometer under double drainage condition. It was found that the soil sample had undergone a 50 % consolidation settlement in 10 minutes. The time (in days) required for 25 % consolidation settlement of the raft foundation will be (round off to the nearest integer)

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
A raft foundation of 30 m x 25 m is
proposed to be constructed at a depth
of 8 m in a sand layer. A 25 m thick
saturated clay layer exists 2 m below
the base of the raft foundation. Below
the clay layer, a dense sand layer exists
at the site. A 25 mm thick undisturbed
sample was collected from the
mid-depth of the clay layer and tested
in a laboratory oedometer under double
drainage condition. It was found that
the soil sample had undergone a 50 %
consolidation settlement in 10 minutes.
The time (in days) required for 25 %
consolidation settlement of the raft
foundation will be
(round off to the nearest integer)
...
Transcribed Image Text:A raft foundation of 30 m x 25 m is proposed to be constructed at a depth of 8 m in a sand layer. A 25 m thick saturated clay layer exists 2 m below the base of the raft foundation. Below the clay layer, a dense sand layer exists at the site. A 25 mm thick undisturbed sample was collected from the mid-depth of the clay layer and tested in a laboratory oedometer under double drainage condition. It was found that the soil sample had undergone a 50 % consolidation settlement in 10 minutes. The time (in days) required for 25 % consolidation settlement of the raft foundation will be (round off to the nearest integer) ...
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Methods of subsurface exploration
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning