A project is being considered by the Tennessee Department of Transportation to replace an aging bridge across the Cumberland River on a state highway. The existing two-lane bridge is expensive to maintain and creates a traffic bottleneck because the state highway is four lanes wide on either side of the bridge. The new bridge can be constructed at a cost of $300,000, and estimated annual maintenance costs are $10,000. The existing bridge has annual maintenance costs of $18,500. The annual benefit of the new four-lane bridge to motorists, due to the removal ofthe traffic bottleneck, has been estimated to be $25,000. Conduct a B–C analysis, using aMARR of 8% and a study period of 25 years, to determine whether the new bridge should be constructed.
A project is being considered by the Tennessee Department of Transportation to replace an aging bridge across the Cumberland River on a state highway. The existing two-lane bridge is expensive to maintain and creates a traffic bottleneck because the state highway is four lanes wide on either side of the bridge. The new bridge can be constructed at a cost of $300,000, and estimated annual maintenance costs are $10,000. The existing bridge has annual maintenance costs of $18,500. The annual benefit of the new four-lane bridge to motorists, due to the removal of
the traffic bottleneck, has been estimated to be $25,000. Conduct a B–C analysis, using aMARR of 8% and a study period of 25 years, to determine whether the new bridge should be constructed.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images