A production process at Brianna Bryant Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). → a) 2 units/hr Sawing 7 units/hr Sanding Assembly 0.7 units/hr Welding Assembly 2.4 units/hr 0.7 units/hr Drilling 5 units/hr Assembly 0.7 units/hr is the bottleneck. b) The bottleneck time is minutes per unit (round your response to two decimal places). c) The throughput time of the overall system is minutes (round your response to two decimal places). d) If the firm operates 8 hours per day, 20 days per month, the monthly capacity of the manufacturing process is units (enter your response as a whole number).

Algebra for College Students
10th Edition
ISBN:9781285195780
Author:Jerome E. Kaufmann, Karen L. Schwitters
Publisher:Jerome E. Kaufmann, Karen L. Schwitters
Chapter11: Systems Of Equations
Section11.CT: Test
Problem 24CT
icon
Related questions
Question
A production process at Brianna Bryant Manufacturing is shown in the figure below. The drilling operation occurs
separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A
product needs to go through only one of the three assembly operations (the operations are in parallel).
→
a)
2 units/hr
Sawing
7 units/hr
Sanding
Assembly
0.7 units/hr
Welding
Assembly
2.4 units/hr
0.7 units/hr
Drilling
5 units/hr
Assembly
0.7 units/hr
is the bottleneck.
b) The bottleneck time is
minutes per unit (round your response to two decimal places).
c) The throughput time of the overall system is minutes (round your response to two decimal places).
d) If the firm operates 8 hours per day, 20 days per month, the monthly capacity of the manufacturing process is
units (enter your response as a whole number).
Transcribed Image Text:A production process at Brianna Bryant Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). → a) 2 units/hr Sawing 7 units/hr Sanding Assembly 0.7 units/hr Welding Assembly 2.4 units/hr 0.7 units/hr Drilling 5 units/hr Assembly 0.7 units/hr is the bottleneck. b) The bottleneck time is minutes per unit (round your response to two decimal places). c) The throughput time of the overall system is minutes (round your response to two decimal places). d) If the firm operates 8 hours per day, 20 days per month, the monthly capacity of the manufacturing process is units (enter your response as a whole number).
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Recommended textbooks for you
Algebra for College Students
Algebra for College Students
Algebra
ISBN:
9781285195780
Author:
Jerome E. Kaufmann, Karen L. Schwitters
Publisher:
Cengage Learning
Algebra & Trigonometry with Analytic Geometry
Algebra & Trigonometry with Analytic Geometry
Algebra
ISBN:
9781133382119
Author:
Swokowski
Publisher:
Cengage
Big Ideas Math A Bridge To Success Algebra 1: Stu…
Big Ideas Math A Bridge To Success Algebra 1: Stu…
Algebra
ISBN:
9781680331141
Author:
HOUGHTON MIFFLIN HARCOURT
Publisher:
Houghton Mifflin Harcourt