A process costs $200 to set up. The run time is 5 minutes per piece and the run costis $30 per hour. Determine the following:a. The fixed cost.b. The variable cost.c. The total cost and unit cost for a lot of 600.d. The total cost and unit cost for a lot of 1200.
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
A
is $30 per hour. Determine the following:
a. The fixed cost.
b. The variable cost.
c. The total cost and unit cost for a lot of 600.
d. The total cost and unit cost for a lot of 1200.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images