A power shovel is fitted with an engine of 150 f.w.h.p. It operates on full load for 6 minutes followed by 8 minutes of idling at one-third power. Its hourly utilization is for 3 cycles. What is its utilization factor?
Q: To achieve 92 percent removal efficiency, the following Volume requirement {V=fn (Q/k) } is needed…
A: The flow of fluid includes movement of an unbalanced fluid. As long as unequalled forces are in…
Q: Question Design high rate treickling ter for troeating a waste water with BOD of 160 mg|L The mate…
A:
Q: 3. Develop a step-by-step flowchart to analyze columns for a specific state of strain.
A: Column is anlayzed for various conditions like pure axial load, pure moment, given strain &…
Q: 2. What specific advantage is provided by horizontal paddle-wheel flocculation systems over…
A: When the operations of fluid movement, variable settling, and flow characteristics work together to…
Q: Please upload your full solution to the following problem. The village of Match Box is using a slow…
A: Answer We know that the CT value requirement for the surface water treatment rule is 3000 for…
Q: It is desired to deliver 60 m3/h of water at 20◦C through 100 m of horizontal asphalted cast iron…
A: Given data in question Discharge Length Temperature Pressure difference To find out Diameter
Q: Q4 Waste water has a5-day BOD of 600 ppmCngll) and tha K value 20t is o.2 por day Find the Ultimate…
A: Given that: BOD5 of the waste water, L5=600 mg/lK value at 20°C, k=0.2 /day
Q: esed for. ans the rate s four stage -- to have a netric desig ded by the F hourly vol Es on traffic
A: ince we only answer up to 3 sub-parts, we’ll answer only 3 subquestions. Please resubmit the…
Q: THIS IS NOT GRADED QUESTION, PLZ SOLVE IT AS SOON AS POSSIBLE. ENVIRONMENTALENGINEERING-2…
A:
Q: For a fixed gas flow rate and drift velocity, calculate the ratio of plate areas for two…
A: The relation between area of plane and efficiency of precipitator is as follows : A=-QWEln(1-n)…
Q: A direct-drive crawler tractor with a rated blade capacity of 12 LCY is being used to exchange the…
A: A dozer is an enormous, mechanized machine furnished with a metal cutting edge to the front for…
Q: Only answer if pump will meet demands, show work justifying answer and the pump size that is…
A: The given data is shown below: Length of pipe=100 mDiameter of pipe=50 mmDischarge=370 l/min
Q: E. Determine the productivity of (3 c-yd) shovel when the height swing factor (0.97), fill factor…
A: Solution: Given: Size of the bucket, Q = 3 cubic yard Bucket fill factor, k = 95 % = 0.95 Earth…
Q: A venturimeter having a throat diameter of 0.1 m is used to estimate the flow rate of a horizontal…
A:
Q: A double-acting reciprocating pump has a speed of 40 r.p.m. and is discharging water at the rate of…
A: Given: Speed, N = 50 r.p.m. Discharge, Qact = 0.01 m3/s Diameter of piston, D = 200 mm = 0.2 m…
Q: efficiency of what will completing
A: Given: Volume=1080 cum Capacity=120 cum/hr Efficiency=75 % To find: Approximate time for…
Q: 1:3 23 24 3-5 46 48 56 6-7 1- 7- 8- Jobs (i-j) 1-3 2-3 2-4 3-5 4-6 4-8 2 8 9 Duration s (in days) 10…
A: Concept of EST, EFT, LST and LFT: Earliest Start time (EST): This is the earliest occurrence time…
Q: The concept of NPSH dictates that liquid dynamic pumpsshould generally be immersed below the…
A: The dynamic pumps work on the principle of fluid flow which indicates that the fluid flows from…
Q: 8. List the relations that control the connection of pumps in series, when we use this type of…
A: Hey there, Here Will know relations that can control the connection of pumps in series' And also…
Q: What commercial size of new cast iron pipe shall be used to carry 4,490 gpm with a loss of head of…
A:
Q: B calculati the B005 data- at 20°C of a waste BOD water sample вол bottle capacity = 300 me…
A:
Q: Problem 6 The small washer is sliding down the cord OA. When it is at the midpoint, its speed is 28…
A: Given:- A washer is sliding down the cord OA At the midpoint, The speed of the washer = 28 m/s The…
Q: A very long garden hose has an internal vol- ume of 2.7 gal. If the garden hose is initially empty,…
A:
Q: A farmer uses a long horizontal pipeline to transfer water with a 1 H.P pump and the discharge is…
A:
Q: a Two turbo capacitics. have be each calculete. installed plant capace demand
A:
Q: 9. List the relations that control the connection of pumps in parallel, when we use this type of…
A: Pumps are connected either in series or parallel . Based on requirements what we have to achieve…
Q: What model type classifies fire in the context of fuel type?
A: As the operator of an industrial or business facility, owners are responsible for providing fire…
Q: Find the production rate of the wheel-tractor-mounted loader, using the following information: -…
A: Given, Bucket capacity (V) = 2.3 m3 Efficiency = 52 min/hr
Q: A drect-drive crawler tractor with a rated blade capacity of 12 LCY is being used to exchange the…
A: soil moving from loose common earth to hard clay and also the data to find out production is…
Q: 1000 trucks drive on a freeway per hour at 55 miles per hour near your homereleasing 0.01 g PM2.5…
A: The objective of the question is to calculate the concentration of diesel PM2.5 at a home located…
Q: For a coagulation basin designed to treat 0.05 m3/s of 20oC surface water, a) What volume is…
A: Velocity Gradient G = 700 s-1Discharge flow in basin = 0.05 m3/sec Detention time = 10 sec Dynamic…
Q: Q- A water treatment plant of capacity, 2 m³/s has filter boxes of dimensions 6 m x 10 m. Loading…
A: A water treatment plant- Plant capacity- Q =2 m3/s,6 m×10 m filter box,Loading rate=100 m3/day/m2,…
Q: A water treatment plant of capacity, 1 m³/s has filter boxes of dimensions 6 m x 10 m. Loading rate…
A:
Q: A 2500 1b niew car has & drag coefcient of 0,29 and = fronal sres of 20 square fee. For & milas/hr.…
A:
Q: This is a fluid machine question. What commercial size of a new cast iron pipe shall be used to…
A: Given data in question friction factor Discharge Loss of head per mile To find out Size of pipe
Q: 1. Transportation and moving How many 5-ton LCY dump trucks will it take to support a wheel loader…
A: "Since you have asked multiple questions, we will solve the first question for you. If you want any…
Q: A pulse-jet baghouse is desired for a finished cement plant. Calculate the number of bags required…
A: Given:- filter 500 m3/min of air dust loading of 3,0 g/m3 Each bag is 3.0 m long 0.13 m diameter…
Q: Q2) A new water storage tank with a volume of 950 m3 must be disinfected by filling with chlorinated…
A:
Q: Ne riab A- For the city shown, check for section A-A? if served pop. By section A-A 70% of total pop…
A: Given data: Total population=100,000 WC=200 l/C/d Fire demand= 80 l/s C=100
Q: An ESP was designed to treat 5500 m3/mm of flue gas from a coal combustion unit and achieve a 98,5%…
A: Given values: Design values: Q1 = 5500 m3/min Efficiency = 98.5% Assumed Drift velocity =we1…
Q: Question- A water treatment plant of capacity, 1 m³/s has filter boxes of dimensions 6 m × 10 m.…
A: Given- Plant capacity- =1 m3/s,6 m×10 m filter box,Loading rate=120 m3/day/m2, It is needed to find…
![A power shovel is fitted with an engine of 150
f.w.h.p. It operates on full load for 6 minutes
followed by 8 minutes of idling at one-third power.
Its hourly utilization is for 3 cycles. What is its
utilization factor?](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F07c23946-ca5d-4bfd-8658-d5674296afc8%2Fb96a19cc-e54e-4093-add5-1b0e26500045%2Fce9rws8_processed.jpeg&w=3840&q=75)
![](/static/compass_v2/shared-icons/check-mark.png)
Step by step
Solved in 3 steps with 2 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
- Q) In a production turning operation, the cylindrical workpiece is 375 mm lọng and 1,50 mm in diameter. Feed 0.30 mm/rev, and depth of cút 4.0 mm. What cutting speed múst be used tó achieve a machining time of 5.0 min? よ 。A direct-drive crawler tractor witha rated blade capacity of 12 LCY is being used to exchange the location of 2 different stockpiles by pushing the material from one stockpile to the other. The first stockpile consists of loose common earth and the second stockpile is hard clay. The distance between Stockpile 1 and Stockpile 2 is 250 ft. Estimate the production of the dozer if the job efficiency is 50 min/h.A drect-drive crawler tractor with a rated blade capacity of 12 LCY is being used to exchange the location of 2 different stockpiles by pushing the material from one stockpile to the other. The first stockple consists of loose common earth and the second stockpile is hard clay. The distance between Stockpile 1 and Stockpile 2 is 250 ft. Estimate the production of the dozer if the job efficiency is 50 min/h,
- A dash pot 10 cm diameter and 12.5 cm long slides vertically down in a 10.05 cm diameter cylinder the oil filling annular space has viscosity 0.8 poise. Find speed with which piston slides down if load on piston is 10 N. 10 cm 10 № 12.5 cmHW: Find the production rate of the wheel-tractor-mounted loader, using the following information: - Bucket capacity, 2.3 m' - Loose volume of handling material, 1480kg/m - Swell, 20% - Tractor operating factor, 52 min/hr - The unit is equipped with a torque converter and a power-shift transmission, having the following speed ranges, forward and reverse: speed ranges, forward and reverse (km/hr) Low range intermediate range 0-6 0-24 high range 0-48 When hauling a loaded bucket, the unit should travel at an average speed of about 80% of its maximum speed in the low range. When returning empty, the unit should travel at an average speed of about 40% of its maximum speed in the intermediate range for distances less than (40m), and at about 60% of its maximum speed in the same range for distances equal and more than (40m). - The fixed time (load, shift, turn and dump) is equal to 0.35 min. Note: Tabulate the results for two distances: 24m and 48m.3m CALCULATE THE NET Fix 37 Fiy Fey FIF 2X 1.5m 1. Sm 37 F2 P TORQUE ABOUT POINT P.
- Chapter 8 SCRAPER CYCLE TIME (See ppg. 236-244) Determine the cycle time for a single-engine scraper rated at 21 cy heaped that is used to haul material from a pit to a fill 900 ft away under severe conditions. The average haul speed will be 14 mph The average return speed will be 20 mph Assume, at an average speed of 5 mph that 200 ft is required to both accelerate and decelerate. The operating efficiency will be equal to a 50-min hour. It will take 0.80 min to load this scraper. distance,ft 88 conversion factor = = Time, min. speed,mph x 88 Distance, ft. Speed, mph Time, min Haul 200 accelerate 500 14 200 decelerate 5 Return 200 accelerate 500 20 200 decelerate Travel time Travel time min Load time Dump time (see table 8.7) Turn time fill| 0.21 Turn time cut 0.30 Total time minQ1/ Determine the reaction for The Con Beam due to settlement o(fomm) @ suppor B-uto using slope B C AF E दिय 8m E = 70 G Pa I = 800* 106m 8 m/ + 8A Lined charnel is shown in Pig. below with two slope sides 1:1 if the e hannel is deliver amo lece calkulete the dmen siore , velecity ,Speaic energy and total energ jand bule slope = 0-00025,n=0-015 .B=lom Am.
- Tractor weighs (20000 kg) and produces a maximum rimpull of (18160 kg) at sea level. the tractor is being operated at an altitude of (2445 m) on wet earth. Derating factor is اختر أحد الخيارات a. 21% O b. 15% O c. 0% O d. All choices are incorrect e. 100% O00 F10 F11 Y F12 Scr Lk PrtS C H V DURING A TEST OF A FRANCIS WHEEL HYDRO ELECTRIC POWERPLANT, THE POWER OUTPUT IS 4 MW AND THE VELOCITY IS 7.5 H/S. THE INSIDE DIAMETER OF THE PENSTOCK IS 3 FT, LENGTH IS 350 FT AND THE ELEVATMON OF THE CENTERLINE OF THE TUR- BINE NO2ZLE IS D FEET ABOVE THE TAILRACE HEADWATER ELEVA- TION 1300 FT, FRICTION FACTOR=0.4, EXIT VELOCITY IN THE PRAFT TUBE 1.6 FT/S IF THE OVERALL EFFICIENCYIS 80%,DETERMINE: • THE TALWATER ELEVATION IN FEET. •THE PRESSURE AT THE BASE OF THE NOZZLE IN PSI. MODULE ASSIGNMENT %3DA plant has installed a single suction centrifugal pump with a discharge of 68 m3/hr under 60 m head and running at 1200 rpm. It is proposed to install another pump with double suction but of the same type to operate at 30 m head`and deliver 90 m3/hr. What must be the impeller diameter of the proposed pump if the diameter of the existing pump is 150 mm?
![Solid Waste Engineering](https://www.bartleby.com/isbn_cover_images/9781305635203/9781305635203_smallCoverImage.gif)
![Solid Waste Engineering](https://www.bartleby.com/isbn_cover_images/9781305635203/9781305635203_smallCoverImage.gif)