A municipal solid-waste site for a city must be located at Site A or Site B. After sorting, some of the solid refuse will be transported to an electric power plant where it will be used as fuel. Data for the hauling of refuse from each site to the power plant are shown in the following table: Site A Site B Average hauling distance Annual rental fee $40,000 for solid-waste 4.8 km 6.4 km $25,000 site Hauling cost $2/m°-km $2/m²-km If the power plant will pay $8.00 per cubic meter of sorted solid waste delivered to the plant, where should the solid-waste site be located? Use the city's viewpoint and assume 120,000 cubic meters of refuse will be hauled to the plant for one year only. One site must be selected.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Determine the ff.

a) how much is the profit for site A?

b) how much is the profit for site B?

c) what site must be selected?

A municipal solid-waste site for a city must be located at Site A or Site B. After
sorting, some of the solid refuse will be transported to an electric power plant where
it will be used as fuel. Data for the hauling of refuse from each site to the power
plant are shown in the following table:
Site A
Site B
Average hauling
distance
4.8 km
6.4 km
Annual rental fee $40,000
for solid-waste
$25,000
site
Hauling cost
$2/m²-km
$2/m²-km
If the power plant will pay $8.00 per cubic meter of sorted solid waste delivered to
the plant, where should the solid-waste site be located?
Use the city's viewpoint and assume 120,000 cubic meters of refuse will be hauled
to the plant for one year only. One site must be selected.
Transcribed Image Text:A municipal solid-waste site for a city must be located at Site A or Site B. After sorting, some of the solid refuse will be transported to an electric power plant where it will be used as fuel. Data for the hauling of refuse from each site to the power plant are shown in the following table: Site A Site B Average hauling distance 4.8 km 6.4 km Annual rental fee $40,000 for solid-waste $25,000 site Hauling cost $2/m²-km $2/m²-km If the power plant will pay $8.00 per cubic meter of sorted solid waste delivered to the plant, where should the solid-waste site be located? Use the city's viewpoint and assume 120,000 cubic meters of refuse will be hauled to the plant for one year only. One site must be selected.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning