A manufacturing company produces four parts that require the use of a lathe and a drill press. The two machines operate 10 hours a day each. The following table provides the time in minutes required by each part: Q)) The constraints and the objectives that are used to Production time in min Product Lathe Drill press 5. 3 6. "Reduce the amount of 3 4. unutilized time for both machines per day" 4 Additionally, the number of units of part 1 may not exceed that of part 2. Assuming that X : number of units need to be produced from product i, wherei e (1.2,3,4) O a Minimize 3z1 + 272 + 5z3 + 4z + s, - s = 600 O b. MinimizeE1 51 +6r2 + 4ra + 74 + s 3z + 2r2 + 5xa + 4z4 + s,-s, = 600 s =600 %3D Oc. Minimize $ +s 52 + 622 + 4r3 +7x4 + s,-s = 10 od. Minimize 521 +6x2 + 4r3 +7z4 + s, 3z1 +2x2 +5rs + 424 + s, s 600 =600 %3D o e Minimize s, +s + s, + s 521 +622 + 4r3 +7r4 + s, 31 +2z2 + 5r3 + 4r, t s = 600 8 = 600
A manufacturing company produces four parts that require the use of a lathe and a drill press. The two machines operate 10 hours a day each. The following table provides the time in minutes required by each part: Q)) The constraints and the objectives that are used to Production time in min Product Lathe Drill press 5. 3 6. "Reduce the amount of 3 4. unutilized time for both machines per day" 4 Additionally, the number of units of part 1 may not exceed that of part 2. Assuming that X : number of units need to be produced from product i, wherei e (1.2,3,4) O a Minimize 3z1 + 272 + 5z3 + 4z + s, - s = 600 O b. MinimizeE1 51 +6r2 + 4ra + 74 + s 3z + 2r2 + 5xa + 4z4 + s,-s, = 600 s =600 %3D Oc. Minimize $ +s 52 + 622 + 4r3 +7x4 + s,-s = 10 od. Minimize 521 +6x2 + 4r3 +7z4 + s, 3z1 +2x2 +5rs + 424 + s, s 600 =600 %3D o e Minimize s, +s + s, + s 521 +622 + 4r3 +7r4 + s, 31 +2z2 + 5r3 + 4r, t s = 600 8 = 600
Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 1 images
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,