A manufacturer of skis produces two types: downhill and cross-country. The times required for manufacturing and finishing each ski are given in the table. The maximum total weekly hours available for manufacturing and finishing the skis are 108 hours and 20 hours, respectively. The profits per ski are $40 for downhill and $90 for cross-country. Determine how many of each kind of ski should be produced to achieve a maximum profit. Manufacturing time per ski Finishing time per ski Downhill 3 hours 0.5 hour Cross-country 2.5 hours 0.5 hour To achieve maximum profit, the manufacturer should produce downhill skis and cross-country skis.

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
A manufacturer of skis produces two types: downhill and cross-country. The times required for manufacturing and finishing each ski are given in the table. The maximum total weekly hours available for manufacturing and finishing the skis are 108 hours and 20 hours, respectively. The profits per ski are $40 for downhill and $30 for cross-country. Determine how many of each kind of ski should be produced to achieve a maximum profit.

|                      | Downhill       | Cross-country  |
|----------------------|----------------|----------------|
| Manufacturing time per ski | 3 hours       | 2.5 hours      |
| Finishing time per ski     | 0.5 hour      | 0.5 hour       |

To achieve maximum profit, the manufacturer should produce [ ] downhill skis and [ ] cross-country skis.
Transcribed Image Text:A manufacturer of skis produces two types: downhill and cross-country. The times required for manufacturing and finishing each ski are given in the table. The maximum total weekly hours available for manufacturing and finishing the skis are 108 hours and 20 hours, respectively. The profits per ski are $40 for downhill and $30 for cross-country. Determine how many of each kind of ski should be produced to achieve a maximum profit. | | Downhill | Cross-country | |----------------------|----------------|----------------| | Manufacturing time per ski | 3 hours | 2.5 hours | | Finishing time per ski | 0.5 hour | 0.5 hour | To achieve maximum profit, the manufacturer should produce [ ] downhill skis and [ ] cross-country skis.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,