A manufacturer of refrigerators must ship at least 100 refrigerators to its two warehouses. Each warehouse holds a maximum of 100 refrigerators. Warehouse A holds 35 refrigerators already, while warehouse B has 30 on hand. It costs $15 to ship a refrigerator to warehouse A and $13 to ship one to warehouse B. How many refrigerators should be shipped to each warehouse to minimize cost? What is the minimum cost? In order to minimize cost, the manufacturer should ship refrigerators to warehouse A and refrigerators to warehouse B.
A manufacturer of refrigerators must ship at least 100 refrigerators to its two warehouses. Each warehouse holds a maximum of 100 refrigerators. Warehouse A holds 35 refrigerators already, while warehouse B has 30 on hand. It costs $15 to ship a refrigerator to warehouse A and $13 to ship one to warehouse B. How many refrigerators should be shipped to each warehouse to minimize cost? What is the minimum cost? In order to minimize cost, the manufacturer should ship refrigerators to warehouse A and refrigerators to warehouse B.
Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
Related questions
Question
100%

Transcribed Image Text:st
2
en 3
cion 4
stion 5
me solve this
@
W
6
X
*
B
F
7.
#
3
K
A manufacturer of refrigerators must ship at least 100 refrigerators to its two warehouses. Each warehouse holds a
maximum of 100 refrigerators. Warehouse A holds 35 refrigerators already, while warehouse B has 30 on hand. It costs
$15 to ship a refrigerator to warehouse A and $13 to ship one to warehouse B. How many refrigerators should be
shipped to each warehouse to minimize cost? What is the minimum cost?
E
80,
D
View an example
SEP
с
L
In order to minimize cost, the manufacturer should ship refrigerators to warehouse A and refrigerators to
warehouse B.
$
4
R
F
%
5
Get more help.
T
FS
G
^
6
CVB
в
Y
H
&
7
4417
N
U
J
*
8
➤ll
A
M
FG
I
(
9
K
Clear all
4
O
V.
)
O
L
-
F10
command
Check answer
P
Л.
:
;
F11
{
+
alt
=
il
?
4) 12
option
#0
"1
1
.
}
1
G
H
delet

Transcribed Image Text:The minimum cost is $
Expert Solution

Step 1
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 4 images

Recommended textbooks for you

Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated

Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education

Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY

Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated

Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education

Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY

Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,

