A load having a peak value of 50 MW and 45% load factor is to be supplied by a steam power station in conjunction with a hydro-power station, the latter supplying 60 million units of energy per annum with a maximum output of 20 MW. (i) Capital cost Steam: Rs 2000 per kW installed Hydro: Rs 3000 per kW installed (ii) Cost of fuel Coal Rs 150 per metric ton; consumption being 0-5 kg per unit generated (iii) Maintenance charges Steam: 0-7 paise per unit Hydro: 0-5 paise per unit (iv) Interest and depreciation Steam: 10% per annum Hydro: 9% per annum Calculate the average cost of energy

Introductory Circuit Analysis (13th Edition)
13th Edition
ISBN:9780133923605
Author:Robert L. Boylestad
Publisher:Robert L. Boylestad
Chapter1: Introduction
Section: Chapter Questions
Problem 1P: Visit your local library (at school or home) and describe the extent to which it provides literature...
icon
Related questions
Question
This question is about electrical power and I want to answer in 15 minutes
A load having a peak value of 50 MW and 45% load factor is to be supplied by a steam power
station in conjunction with a hydro-power station, the latter supplying 60 million units of energy
per annum with a maximum output of 20 Mw.
(i) Capital cost
Steam: Rs 2000 per kW installed
Hydro: Rs 3000 per kW installed
(ii) Cost of fuel
Coal Rs 150 per metric ton; consumption being 0-5 kg per
unit generated
(iii) Maintenance charges
Steam: 0-7 paise per unit
Hydro: 0-5 paise per unit
(iv) Interest and depreciation Steam: 10% per annum
Hydro: 9% per annum
Calculate the average cost of energy
Transcribed Image Text:A load having a peak value of 50 MW and 45% load factor is to be supplied by a steam power station in conjunction with a hydro-power station, the latter supplying 60 million units of energy per annum with a maximum output of 20 Mw. (i) Capital cost Steam: Rs 2000 per kW installed Hydro: Rs 3000 per kW installed (ii) Cost of fuel Coal Rs 150 per metric ton; consumption being 0-5 kg per unit generated (iii) Maintenance charges Steam: 0-7 paise per unit Hydro: 0-5 paise per unit (iv) Interest and depreciation Steam: 10% per annum Hydro: 9% per annum Calculate the average cost of energy
Expert Solution
steps

Step by step

Solved in 6 steps

Blurred answer
Knowledge Booster
Star delta conversion
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Introductory Circuit Analysis (13th Edition)
Introductory Circuit Analysis (13th Edition)
Electrical Engineering
ISBN:
9780133923605
Author:
Robert L. Boylestad
Publisher:
PEARSON
Delmar's Standard Textbook Of Electricity
Delmar's Standard Textbook Of Electricity
Electrical Engineering
ISBN:
9781337900348
Author:
Stephen L. Herman
Publisher:
Cengage Learning
Programmable Logic Controllers
Programmable Logic Controllers
Electrical Engineering
ISBN:
9780073373843
Author:
Frank D. Petruzella
Publisher:
McGraw-Hill Education
Fundamentals of Electric Circuits
Fundamentals of Electric Circuits
Electrical Engineering
ISBN:
9780078028229
Author:
Charles K Alexander, Matthew Sadiku
Publisher:
McGraw-Hill Education
Electric Circuits. (11th Edition)
Electric Circuits. (11th Edition)
Electrical Engineering
ISBN:
9780134746968
Author:
James W. Nilsson, Susan Riedel
Publisher:
PEARSON
Engineering Electromagnetics
Engineering Electromagnetics
Electrical Engineering
ISBN:
9780078028151
Author:
Hayt, William H. (william Hart), Jr, BUCK, John A.
Publisher:
Mcgraw-hill Education,