A linear programming computer package is needed. Frandec Company manufactures, assembles, and rebuilds material-handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 4,500 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit are shown. Component Manufacturing Cost Purchase Cost Frame $39.00 $52.00 Support $12.50 $16.00 Strap $7.50 $8.50 Three departments are involved in the production of these components. The time (in minutes per unit) required to process each component in each department and the available capacity (in hours) for the three departments are as follows. Component Department Cutting Milling Shaping Frame 3.5 2.2 3.1 Support 1.3 1.7 2.6 Strap 0.8 — 1.7 Capacity (hours) 350 420 680 (a) Formulate and solve a linear programming model for this make-or-buy application. (Let FM = number of frames manufactured, FP = number of frames purchased, SM = number of supports manufactured, SP = number of supports purchased, TM = number of straps manufactured, and TP = number of straps purchased. Express time in minutes per unit.) Min Cutting constraint Milling constraint Shaping constraint Frame constraint Support constraint Strap constraint FM, FP, SM, SP, TM, TP ≥ 0 How many of each component should be manufactured and how many should be purchased? (Round your answers to the nearest whole number.) (FM, FP, SM, SP, TM, TP) = (b) What is the total cost (in $) of the manufacturing and purchasing plan? $ (c) How many hours of production time are used in each department? (Round your answers to two decimal places.) Cutting hrsMilling hrsShaping hrs
A linear programming computer package is needed. Frandec Company manufactures, assembles, and rebuilds material-handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 4,500 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit are shown. Component Manufacturing Cost Purchase Cost Frame $39.00 $52.00 Support $12.50 $16.00 Strap $7.50 $8.50 Three departments are involved in the production of these components. The time (in minutes per unit) required to process each component in each department and the available capacity (in hours) for the three departments are as follows. Component Department Cutting Milling Shaping Frame 3.5 2.2 3.1 Support 1.3 1.7 2.6 Strap 0.8 — 1.7 Capacity (hours) 350 420 680 (a) Formulate and solve a linear programming model for this make-or-buy application. (Let FM = number of frames manufactured, FP = number of frames purchased, SM = number of supports manufactured, SP = number of supports purchased, TM = number of straps manufactured, and TP = number of straps purchased. Express time in minutes per unit.) Min Cutting constraint Milling constraint Shaping constraint Frame constraint Support constraint Strap constraint FM, FP, SM, SP, TM, TP ≥ 0 How many of each component should be manufactured and how many should be purchased? (Round your answers to the nearest whole number.) (FM, FP, SM, SP, TM, TP) = (b) What is the total cost (in $) of the manufacturing and purchasing plan? $ (c) How many hours of production time are used in each department? (Round your answers to two decimal places.) Cutting hrsMilling hrsShaping hrs
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
100%
A linear programming computer package is needed.
Frandec Company manufactures, assembles, and rebuilds material-handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 4,500 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit are shown.
Component | Purchase Cost | |
---|---|---|
Frame | $39.00 | $52.00 |
Support | $12.50 | $16.00 |
Strap | $7.50 | $8.50 |
Three departments are involved in the production of these components. The time (in minutes per unit) required to process each component in each department and the available capacity (in hours) for the three departments are as follows.
Component | Department | ||
---|---|---|---|
Cutting | Milling | Shaping | |
Frame | 3.5 | 2.2 | 3.1 |
Support | 1.3 | 1.7 | 2.6 |
Strap | 0.8 | — | 1.7 |
Capacity (hours) | 350 | 420 | 680 |
(a)
Formulate and solve a linear programming model for this make-or-buy application. (Let FM = number of frames manufactured, FP = number of frames purchased, SM = number of supports manufactured, SP = number of supports purchased, TM = number of straps manufactured, and TP = number of straps purchased. Express time in minutes per unit.)
Min
Cutting constraint
Milling constraint
Shaping constraint
Frame constraint
Support constraint
Strap constraint
FM, FP, SM, SP, TM, TP ≥ 0
How many of each component should be manufactured and how many should be purchased? (Round your answers to the nearest whole number.)
(FM, FP, SM, SP, TM, TP) =
(b)
What is the total cost (in $) of the manufacturing and purchasing plan?
$
(c)
How many hours of production time are used in each department? (Round your answers to two decimal places.)
Cutting hrsMilling hrsShaping hrs
(d)
How much (in $) should Frandec be willing to pay for an additional hour of time in the shaping department?
$
(e)
Another manufacturer has offered to sell frames to Frandec for $45 each. Could Frandec improve its position by pursuing this opportunity? Why or why not? (Round your answer to three decimal places.)
. The reduced cost of indicates that the solution be improved.
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 4 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Recommended textbooks for you
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.