A freeway bottleneck location has a capacity of 5,000 veh/h. During a typical morning peak period, the actual demand flow rate arriving at the bottleneck is as follows: 7:00-8:00 AM 8:00-8:30 AM 8:30-9:30 AM 9:30-10:00 AM 4,500 veh/h 5,400 veh/h 6,000 veh/h 5,000 veh/h 4,500 veh/h 4,000 veh/h 10:00-11:00 AM After 11:00 AM a. Draw of graph of demand versus capacity for the situation described. b. What is the size of the queue upstream of the bottleneck at 8:30 AM, 9:30 AM, 10:00 AM, and 11:00 AM? c. At what time does the queue dissipate?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
A freeway bottleneck location has a capacity of 5,000 veh/h. During a typical morning peak period, the actual demand flow rate arriving at the bottleneck is as follows: 7:00-8:00 AM 4,500 veh/h 8:00-8:30 AM 5,400 veh/h 8:30-9:30 AM 6,000 veh/h 9:30-10:00 AM 5,000 veh/h 10:00-11:00 AM 4,500 veh/h After 11:00 AM 4,000 veh/h a. Draw of graph of demand versus capacity for the situation described. b. What is the size of the queue upstream of the bottleneck at 8:30 AM, 9:30 AM, 10:00 AM, and 11:00 AM? c. At what time does the queue dissipate?
A freeway bottleneck location has a capacity of 5,000 veh/h. During a typical morning peak period, the
actual demand flow rate arriving at the bottleneck is as follows:
7:00-8:00 AM
8:00-8:30 AM
8:30-9:30 AM
9:30-10:00 AM
4,500 veh/h
5,400 veh/h
6,000 veh/h
5,000 veh/h
4,500 veh/h
4,000 veh/h
10:00-11:00 AM
After 11:00 AM
a. Draw of graph of demand versus capacity for the situation described.
b. What is the size of the queue upstream of the bottleneck at 8:30 AM, 9:30 AM, 10:00 AM, and
11:00 AM?
c. At what time does the queue dissipate?
Transcribed Image Text:A freeway bottleneck location has a capacity of 5,000 veh/h. During a typical morning peak period, the actual demand flow rate arriving at the bottleneck is as follows: 7:00-8:00 AM 8:00-8:30 AM 8:30-9:30 AM 9:30-10:00 AM 4,500 veh/h 5,400 veh/h 6,000 veh/h 5,000 veh/h 4,500 veh/h 4,000 veh/h 10:00-11:00 AM After 11:00 AM a. Draw of graph of demand versus capacity for the situation described. b. What is the size of the queue upstream of the bottleneck at 8:30 AM, 9:30 AM, 10:00 AM, and 11:00 AM? c. At what time does the queue dissipate?
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning