A community playhouse needs to determine the lowest-cost production budget for an upcoming show. They have to determine which set pieces to construction and which to rent. The organization has only two weeks to construct the set. The theater has two carpenters who work up to 12 hours a week, each at $12 an hour. Additionally, the theater has a scenic artist who can work 15 hours per week to paint as needed at $16 per hour. The set needs 20 flats (walls), two hanging drops, and three wooden tables (props). The number of hours required for each piece for carpentry and painting is shown below. Flats, hanging drops, and props can also be rented at a cost of $75, $500, and $400 each, respectively. How many of each unit should be built by the theater and how many should be rented to minimize total cost?

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
Flats
Hanging Drops
Props
Carpentry
0.5
3.0
2.0
Painting
2.0
13.0
3.0
Transcribed Image Text:Flats Hanging Drops Props Carpentry 0.5 3.0 2.0 Painting 2.0 13.0 3.0
A community playhouse needs to determine the lowest-cost production budget for an upcoming show.
They have to determine which set pieces to construction and which to rent. The organization has only
two weeks to construct the set. The theater has two carpenters who work up to 12 hours a week, each
at $12 an hour. Additionally, the theater has a scenic artist who can work 15 hours per week to paint as
needed at $16 per hour. The set needs 20 flats (walls), two hanging drops, and three wooden tables
(props). The number of hours required for each piece for carpentry and painting is shown below. Flats,
hanging drops, and props can also be rented at a cost of $75, $500, and $400 each, respectively. How
many of each unit should be built by the theater and how many should be rented to minimize total
cost?
Click the icon to view the table of carpentry and painting hours.
The optimal integer solution is to build flat(s) and rent
flat(s); build hanging drop(s) and rent
hanging drop(s); build prop(s) and rent prop(s). This solution gives the
cost,
which is $.
(Type whole numbers.)
Transcribed Image Text:A community playhouse needs to determine the lowest-cost production budget for an upcoming show. They have to determine which set pieces to construction and which to rent. The organization has only two weeks to construct the set. The theater has two carpenters who work up to 12 hours a week, each at $12 an hour. Additionally, the theater has a scenic artist who can work 15 hours per week to paint as needed at $16 per hour. The set needs 20 flats (walls), two hanging drops, and three wooden tables (props). The number of hours required for each piece for carpentry and painting is shown below. Flats, hanging drops, and props can also be rented at a cost of $75, $500, and $400 each, respectively. How many of each unit should be built by the theater and how many should be rented to minimize total cost? Click the icon to view the table of carpentry and painting hours. The optimal integer solution is to build flat(s) and rent flat(s); build hanging drop(s) and rent hanging drop(s); build prop(s) and rent prop(s). This solution gives the cost, which is $. (Type whole numbers.)
Expert Solution
steps

Step by step

Solved in 3 steps with 5 images

Blurred answer
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.