A bakery sells cream pies and carrot cakes. Each cream pie requires 30 minutes preparation time, 30 minutes baking time, and 15 minutes for finishing. Each carrot cake requires 40 minutes preparation time, 55 baking time, and 10 minutes for finishing. (a) Write a matrix T representing the required time for preparation, baking, and finishing for the cream pies and carrot cakes. (b) The bakery receives an order for 20 cream pies and 8 carrot cakes. Find a matrix S so that TS gives the total preparation, baking, and finishing times required to fill this order. (c) What is the total baking time? What is the total finishing time? Write a matrix T. T= Cream pie Carrot cake Preparation Baking Finishing

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
A bakery sells cream pies and carrot cakes. Each cream pie requires 30 minutes preparation time, 30 minutes baking time, and 15 minutes for finishing. Each carrot cake requires 40 minutes preparation time, 55 minutes
baking time, and 10 minutes for finishing.
(a) Write a matrix T representing the required time for preparation, baking, and finishing for the cream pies and carrot cakes.
(b) The bakery receives an order for 20 cream pies and 8 carrot cakes. Find a matrix S so that TS gives the total preparation, baking, and finishing times required to fill this order.
(c) What is the total baking time? What is the total finishing time?
Write a matrix T.
Cream pie Carrot cake
Preparation
Baking
Finishing
C
Transcribed Image Text:A bakery sells cream pies and carrot cakes. Each cream pie requires 30 minutes preparation time, 30 minutes baking time, and 15 minutes for finishing. Each carrot cake requires 40 minutes preparation time, 55 minutes baking time, and 10 minutes for finishing. (a) Write a matrix T representing the required time for preparation, baking, and finishing for the cream pies and carrot cakes. (b) The bakery receives an order for 20 cream pies and 8 carrot cakes. Find a matrix S so that TS gives the total preparation, baking, and finishing times required to fill this order. (c) What is the total baking time? What is the total finishing time? Write a matrix T. Cream pie Carrot cake Preparation Baking Finishing C
Expert Solution
steps

Step by step

Solved in 5 steps with 6 images

Blurred answer
Similar questions
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,