A 12-kg ball is connected to a string and is moving within the horizontal plane. If the force in the string ♬ pulls the string in so that its length is a function of time as shown, determine the speed of the ball when t-5 s. Initially, the ball was given a velocity of 10 m/s that was perpendicular to the string. Also, what is the total work done by F during this process?

icon
Related questions
Question
A 12-kg ball is connected to a string and is moving within the
horizontal plane. If the force in the string F pulls the string in
so that its length is a function of time as shown, determine
the speed of the ball when t=5 s. Initially, the ball was given
a velocity of 10 m/s that was perpendicular to the string.
Also, what is the total work done by F during this process?
FBD within
horizontal plane:
M₂-0
Σ[Μ = 0
Transcribed Image Text:A 12-kg ball is connected to a string and is moving within the horizontal plane. If the force in the string F pulls the string in so that its length is a function of time as shown, determine the speed of the ball when t=5 s. Initially, the ball was given a velocity of 10 m/s that was perpendicular to the string. Also, what is the total work done by F during this process? FBD within horizontal plane: M₂-0 Σ[Μ = 0
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer