A 100-MVA, 18-kV generator is connected to a transformer. The generator has reactances of 19%, 26% and 130% and time constraints of Td" = 0.035 sec, Td' = 2.0 sec and TA = 0.2 sec. A 5-cycle breaker is connected between the generator and the transformer. A three=phase short circuit occurs between the breaker and the transformer when the generator is operating at 5% above rated voltage and at no-load. Calculate a. The minimum instantaneous symmetrical fault current which the breaker interrupts (kA) b. The instantaneous asymmetrical fault current (kA) which the breaker interrupts assuming maximum DC offset
Protection System
A system that protects electrical systems from faults by isolating the problematic part from the remainder of the system, preventing power from being cut from healthy elements, improving system dependability and efficiency is the protection system. Protection devices are the equipment that are utilized to implement the protection system.
Predictive Maintenance System
Predictive maintenance technologies are designed to assist in determining the state of in-service equipment so that maintenance can be scheduled. Predictive maintenance is the application of information; proactive maintenance approaches examine the condition of equipment and anticipate when it should maintain. The purpose of predictive maintenance is to forecast when equipment will fail (depending on a variety of parameters), then prevent the failure through routine and corrective maintenance.Condition monitoring is the continual monitoring of machines during process conditions to maintain optimal machine use, which is necessary for predictive maintenance. There are three types of condition monitoring: online, periodic, and remote. Finally, remote condition monitoring allows the equipment observed from a small place and data supplied for analysis.
Preventive Maintenance System
To maintain the equipment and materials on a regular basis in order to maintain those running conditions and reduce unnecessary shutdowns due to unexpected equipment failure is called Preventive Maintenance (PM).
A 100-MVA, 18-kV generator is connected to a transformer. The generator has reactances of 19%, 26% and 130% and time constraints of Td" = 0.035 sec, Td' = 2.0 sec and TA = 0.2 sec. A 5-cycle breaker is connected between the generator and the transformer. A three=phase short circuit occurs between the breaker and the transformer when the generator is operating at 5% above rated voltage and at no-load. Calculate
a. The minimum instantaneous symmetrical fault current which the breaker interrupts (kA)
b. The instantaneous asymmetrical fault current (kA) which the breaker interrupts assuming maximum DC offset
Trending now
This is a popular solution!
Step by step
Solved in 2 steps