9. COMPASS the observed and calculated data for two different transit- tape surveys: RULE. Given in the accompanying tabulations are LATITUDE DEPARTURE LINE DISTANCE BEARING +N -W S 52°51'w. N 00°42'E S 85°57'E s 03°04'w 1-2 388.08 m 234.36 309.32 2-3 3-4 732.72 732.67 8.95 324.78 22.94 323.97 4-1 477.24 476.56 25.53 Sums 1922.82 m +732.67 -733.86 +332.92 -334.85 (D) (ENL) CESL) (EED) (EWD) mis- set of survey data, đdirection of the side of error, For each determine the linear closure, the survey after the latitudes and departures are by to a suitable scale the adjusted traverse. and precision of balanced Tabulate values accordingly and draw the compass rule.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Please *recheck and provide*clear and*complete step-by-step solutions in *scanned handwriting or computerized output. Thank you. 

Tabulate the values:

9. COMPASS
the observed and calculated data for two different transit-
tape surveys:
RULE. Given in the accompanying tabulations are
LATITUDE
DEPARTURE
LINE
DISTANCE
BEARING
+N
-W
S 52°51'w.
N 00°42'E
S 85°57'E
s 03°04'w
1-2
388.08 m
234.36
309.32
732.72
2-3
3- 4
732.67
8.95
324.78
22.94
323.97
4 - 1
477.24
476.56
25.53
Sums
1922.82 m
+732.67
-733.86
+ 332.92
-334.85
(D)
(ENL)
CESL)
(EED)
(EWD)
mis-
set of survey data,
direction of the side of error,
For
each
determine the
linear
and precision of
balanced
closure,
the survey after the latitudes and departures are
by the compass rule.
to a suitable scale the adjusted traverse.
Tabulate values accordingly and draW
Transcribed Image Text:9. COMPASS the observed and calculated data for two different transit- tape surveys: RULE. Given in the accompanying tabulations are LATITUDE DEPARTURE LINE DISTANCE BEARING +N -W S 52°51'w. N 00°42'E S 85°57'E s 03°04'w 1-2 388.08 m 234.36 309.32 732.72 2-3 3- 4 732.67 8.95 324.78 22.94 323.97 4 - 1 477.24 476.56 25.53 Sums 1922.82 m +732.67 -733.86 + 332.92 -334.85 (D) (ENL) CESL) (EED) (EWD) mis- set of survey data, direction of the side of error, For each determine the linear and precision of balanced closure, the survey after the latitudes and departures are by the compass rule. to a suitable scale the adjusted traverse. Tabulate values accordingly and draW
Expert Solution
steps

Step by step

Solved in 4 steps with 3 images

Blurred answer
Knowledge Booster
Engineering symbols
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning