7m 4m A- A 4m 5m D2 D1

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
100%
7m
4m
A-
A
4m
5m
D2
D1
Plan
1m
0.18m
0.75m
0.25m
Lintel (12:4)
Roof(1:2:4)
2m
Blinding(1:3:6)
D.P.C(1:24)
1m
Tiles (30X30)cm
0.1m
TO.50m
G.L
10.38m
D. 16m
0.16
GL
Foundation(1:1.5:3)
0.30m
H0.9m
H0 48m
H0.36m
Ho.24m
Section (A - A)
1m
Figure 1 plan and section A- A
Dimensions (m)
2.00 x 2.00
Items
No.
Note
Frame(8cm) was located in
the center of the wall.
Windows
3
Door
1
2.10 x 1.75
1
2.10 x 1.00
Transcribed Image Text:7m 4m A- A 4m 5m D2 D1 Plan 1m 0.18m 0.75m 0.25m Lintel (12:4) Roof(1:2:4) 2m Blinding(1:3:6) D.P.C(1:24) 1m Tiles (30X30)cm 0.1m TO.50m G.L 10.38m D. 16m 0.16 GL Foundation(1:1.5:3) 0.30m H0.9m H0 48m H0.36m Ho.24m Section (A - A) 1m Figure 1 plan and section A- A Dimensions (m) 2.00 x 2.00 Items No. Note Frame(8cm) was located in the center of the wall. Windows 3 Door 1 2.10 x 1.75 1 2.10 x 1.00
For Figure (1), calculate the following:
1. Cost of excavation (cost per cubic meter 5000 Iraqi dinars) and
Quantity of cement, sand and gravel for the foundation (1:1.5:3).
2. Quantity of bricks and mortar (1:3) under the D.P.C.
3. Quantity of bricks and mortar (1:3) above the D.P.C.
4. Quantity of plastering with lime mortar for internal walls (2 cm
thickness) without roof.
5. Quantity of plastering with cement and sand mortar for external walls
(2 cm thickness).
6. Quantity of cement, sand and gravel for the slab (1:2:4).
Transcribed Image Text:For Figure (1), calculate the following: 1. Cost of excavation (cost per cubic meter 5000 Iraqi dinars) and Quantity of cement, sand and gravel for the foundation (1:1.5:3). 2. Quantity of bricks and mortar (1:3) under the D.P.C. 3. Quantity of bricks and mortar (1:3) above the D.P.C. 4. Quantity of plastering with lime mortar for internal walls (2 cm thickness) without roof. 5. Quantity of plastering with cement and sand mortar for external walls (2 cm thickness). 6. Quantity of cement, sand and gravel for the slab (1:2:4).
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Connections
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning