4.You are required to stake out a series of lathe to guide construction for a section of highway. The design data are as follows: STATION 13+56 13+56 to 14+72 14+72 to 15+00 Elevation=234.476 Grade=-1.8% Grade = -1.4% You are required to stake out points at every even 20m station, plus the three critical points (the start and end stations plus 14+72, where the grade changes). You can stake out Stations 13+56 to 14+60 from one setup with an HI= 234.618. For the remaining stations, you must use a second setup with an HI= 232.753.

Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter4: Measuring Site Work, Excavation, And Piling
Section: Chapter Questions
Problem 8RQ
icon
Related questions
icon
Concept explainers
Question
Note :hand written solution should be avoided.
4.You are required to stake out a series of lathe to guide construction for a section of
highway. The design data are as follows:
STATION
13+56
13+56 to 14+72
14+72 to 15+00
Elevation 234.476
Grade = -1.8%
Grade=-1.4%
You are required to stake out points at every even 20m station, plus the three critical
points (the start and end stations plus 14+72, where the grade changes).
You can stake out Stations 13+56 to 14+60 from one setup with an HI= 234.618.
For the remaining stations, you must use a second setup with an HI- 232.753.
4
MARA FRAMAT
Transcribed Image Text:4.You are required to stake out a series of lathe to guide construction for a section of highway. The design data are as follows: STATION 13+56 13+56 to 14+72 14+72 to 15+00 Elevation 234.476 Grade = -1.8% Grade=-1.4% You are required to stake out points at every even 20m station, plus the three critical points (the start and end stations plus 14+72, where the grade changes). You can stake out Stations 13+56 to 14+60 from one setup with an HI= 234.618. For the remaining stations, you must use a second setup with an HI- 232.753. 4 MARA FRAMAT
What are the grade rod readings for each stakeout point?
Rod readings must be given to 3 decimal places.
Stations must be given as a whole number including + symbol.
Station 13+56
=
Input: Rod Reading
eg.. ####
4
Transcribed Image Text:What are the grade rod readings for each stakeout point? Rod readings must be given to 3 decimal places. Stations must be given as a whole number including + symbol. Station 13+56 = Input: Rod Reading eg.. #### 4
Expert Solution
steps

Step by step

Solved in 5 steps with 3 images

Blurred answer
Knowledge Booster
Length and length related variables
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Architectural Drafting and Design (MindTap Course…
Architectural Drafting and Design (MindTap Course…
Civil Engineering
ISBN:
9781285165738
Author:
Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:
Cengage Learning
Residential Construction Academy: House Wiring (M…
Residential Construction Academy: House Wiring (M…
Civil Engineering
ISBN:
9781285852225
Author:
Gregory W Fletcher
Publisher:
Cengage Learning
Construction Materials, Methods and Techniques (M…
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Engineering Fundamentals: An Introduction to Engi…
Engineering Fundamentals: An Introduction to Engi…
Civil Engineering
ISBN:
9781305084766
Author:
Saeed Moaveni
Publisher:
Cengage Learning