4. An intersection has a 3-timing stage signal with the movements allowed in each timing stage and corresponding analysis and saturation flow rates shown below. Consider that the total lost time is 12 seconds and a critical v/c ratio of 0.85 was desired. The cycle length is 60 seconds. Calculate the delay and level of service for (a) the westbound left lane group, (b) the westbound approach and (c) the whole intersection. Timing Stage Allowed movements Analysis flow rate (veh/h) Saturation flow rate(veh/h) Effective green (sec) 1 NB L SB L 330 365 1700 1750 13.9 2 NB T/R SB T/R 1125 1075 3400 3300 22.1 3 EB T/R WB T/R WB L EB L 110 80 650 600 1750 250 11.3 285 1800

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Please answer question 4
2. An intersection has a 2-timing stage signal with the movements allowed in each timing
stage, analysis and saturation flow rates shown below. Consider that the lost time per
timing stage is 3 seconds and a critical v/c ratio of 0.85 is desired. Calculate minimum
cycle length, and the effective green times (based on minimum cycle length).
Timing Stage
1
EB L
WB L
Allowed movements
NB T/R SB T/R
Analysis flow rate (veh/h)
1125 1075
Saturation flow rate(veh/h) 600 600 3400 3200 650 600
NBL SB L
40 30
100
80
3. A six-lane urban freeway (3 lanes per direction) is on rolling terrain with 10-ft lanes,
obstructions 5 ft from the right edge of the traveled pavement and 8 ramps within 3 miles
upstream and 3 miles downstream of the midpoints of the analysis segment. A directional
weekday peak-hour volume of 2800 vehicles is observed with 760 vehicles arriving in the
most congested 15-min period. The traffic stream has 7% single unit trucks and 3%
tractor-trailer trucks.
a. Determine the density and the LOS.
b. If instead of rolling terrain, the freeway segment has an incline of 4.5% for a
distance longer than 2 miles, determine the density and LOS.
Timing Stage
Allowed movements
Analysis flow rate (veh/h)
Saturation flow rate(veh/h)
Effective green (sec)
1
NBL SB L
330 365
1700 1750
13.9
4. An intersection has a 3-timing stage signal with the movements allowed in each timing
stage and corresponding analysis and saturation flow rates shown below. Consider that
the total lost time is 12 seconds and a critical v/c ratio of 0.85 was desired. The cycle
length is 60 seconds. Calculate the delay and level of service for (a) the westbound left
lane group, (b) the westbound approach and (c) the whole intersection.
NB T/R
1125
3400
2
2
EB T/R WB T/R
SB T/R
1075
3300
250
1750
22.1
EB L WB L
110 80
650 600
295
1800
3
EB T/R WB T/R
250
1750
11.3
285
1800
Transcribed Image Text:2. An intersection has a 2-timing stage signal with the movements allowed in each timing stage, analysis and saturation flow rates shown below. Consider that the lost time per timing stage is 3 seconds and a critical v/c ratio of 0.85 is desired. Calculate minimum cycle length, and the effective green times (based on minimum cycle length). Timing Stage 1 EB L WB L Allowed movements NB T/R SB T/R Analysis flow rate (veh/h) 1125 1075 Saturation flow rate(veh/h) 600 600 3400 3200 650 600 NBL SB L 40 30 100 80 3. A six-lane urban freeway (3 lanes per direction) is on rolling terrain with 10-ft lanes, obstructions 5 ft from the right edge of the traveled pavement and 8 ramps within 3 miles upstream and 3 miles downstream of the midpoints of the analysis segment. A directional weekday peak-hour volume of 2800 vehicles is observed with 760 vehicles arriving in the most congested 15-min period. The traffic stream has 7% single unit trucks and 3% tractor-trailer trucks. a. Determine the density and the LOS. b. If instead of rolling terrain, the freeway segment has an incline of 4.5% for a distance longer than 2 miles, determine the density and LOS. Timing Stage Allowed movements Analysis flow rate (veh/h) Saturation flow rate(veh/h) Effective green (sec) 1 NBL SB L 330 365 1700 1750 13.9 4. An intersection has a 3-timing stage signal with the movements allowed in each timing stage and corresponding analysis and saturation flow rates shown below. Consider that the total lost time is 12 seconds and a critical v/c ratio of 0.85 was desired. The cycle length is 60 seconds. Calculate the delay and level of service for (a) the westbound left lane group, (b) the westbound approach and (c) the whole intersection. NB T/R 1125 3400 2 2 EB T/R WB T/R SB T/R 1075 3300 250 1750 22.1 EB L WB L 110 80 650 600 295 1800 3 EB T/R WB T/R 250 1750 11.3 285 1800
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Intersection control
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning