4. A metal fabrication shop has a single punch press. There are currently three parts that the shop has agreed to produce that require the press, and it appears that they will be supplying these parts well into the future. You may assume that the press is the critical resource for these parts, so that we need not worry about the interaction of the press with the other machines in the shop. The relevant information is listed below: Part Number Annual Demand Setup Cost ($) Cost per unit ($) Production Rate per year 123 2,500 80 16 45,000 5,500 120 18 40,000 1,450 60 60 22 26,000
4. A metal fabrication shop has a single punch press. There are currently three parts that the shop has agreed to produce that require the press, and it appears that they will be supplying these parts well into the future. You may assume that the press is the critical resource for these parts, so that we need not worry about the interaction of the press with the other machines in the shop. The relevant information is listed below: Part Number Annual Demand Setup Cost ($) Cost per unit ($) Production Rate per year 123 2,500 80 16 45,000 5,500 120 18 40,000 1,450 60 60 22 26,000
Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
Related questions
Question

Transcribed Image Text:4. A metal fabrication shop has a single punch press. There are currently three parts that
the shop has agreed to produce that require the press, and it appears that they will be
supplying these parts well into the future. You may assume that the press is the critical
resource for these parts, so that we need not worry about the interaction of the press
with the other machines in the shop. The relevant information is listed below:
Part Number
Annual Demand
Setup Cost ($)
Cost per unit ($) Production Rate
per year
1
2,500
80
16
45,000
2
3
5,500
120
18
40,000
1,450
60
22
26,000
Holding costs are based on an 18 percent annual interest rate, and the products are to
be produced in sequence on a rotation cycle. Setup times can be considered negligible.
a. What is the optimal time between setups for part number 1?
b. What percentage of the time is the punch press idle, assuming an optimal
rotation cycle policy?
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 5 steps with 11 images

Recommended textbooks for you

Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated

Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education

Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY

Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated

Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education

Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY

Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,

