3. Using an Excel, create a Construction Schedule, Manpower Schedule, Equipment Schedule based on this Table M1 M2 M3 M4 M5 M6 M7 M8 M12 M13 ACTIVITY Footing Starter Wall Slab On Grade (SOG) Ground Floor Shell (CHB) 2nd Floor Slab 2nd Floor Shell (CHB) Stair & Canopy Slab / Concrete Ledges Concrete Roof Beam M9 Roof Framing M10 Roofing Sheet M11 2nd Floor Plastering Works Ground Floor Plastering Works Mechanical Pipes & Fixtures Installation M14 Electrical Pipes & Fixtures Installation M15 Plumbing Pipes & Fixtures Installation M16 Waterproofing M17 Windows Installation M18 Ceilings M19 Partitions M20 Interior Painting M21 Exterior Painting M22 Functionality Test M23 Land Scaping DURATION (Days) 8 6 5 14 16 14 5 5 4 3 7 6 8 10 10 3 NW 2 10 12 15 12 1 1
3. Using an Excel, create a Construction Schedule, Manpower Schedule, Equipment Schedule based on this Table M1 M2 M3 M4 M5 M6 M7 M8 M12 M13 ACTIVITY Footing Starter Wall Slab On Grade (SOG) Ground Floor Shell (CHB) 2nd Floor Slab 2nd Floor Shell (CHB) Stair & Canopy Slab / Concrete Ledges Concrete Roof Beam M9 Roof Framing M10 Roofing Sheet M11 2nd Floor Plastering Works Ground Floor Plastering Works Mechanical Pipes & Fixtures Installation M14 Electrical Pipes & Fixtures Installation M15 Plumbing Pipes & Fixtures Installation M16 Waterproofing M17 Windows Installation M18 Ceilings M19 Partitions M20 Interior Painting M21 Exterior Painting M22 Functionality Test M23 Land Scaping DURATION (Days) 8 6 5 14 16 14 5 5 4 3 7 6 8 10 10 3 NW 2 10 12 15 12 1 1
Computer Networking: A Top-Down Approach (7th Edition)
7th Edition
ISBN:9780133594140
Author:James Kurose, Keith Ross
Publisher:James Kurose, Keith Ross
Chapter1: Computer Networks And The Internet
Section: Chapter Questions
Problem R1RQ: What is the difference between a host and an end system? List several different types of end...
Related questions
Question

Transcribed Image Text:3. Using an Excel, create a Construction Schedule, Manpower Schedule, Equipment Schedule based on this Table
ACTIVITY
M1
M2
M3
M4
M5
2nd Floor Slab
M6 2nd Floor Shell (CHB)
M7
M8
Footing
Starter Wall
M12
M13
Slab On Grade (SOG)
Ground Floor Shell (CHB)
Stair & Canopy Slab / Concrete Ledges
Concrete Roof Beam
M9
Roof Framing
M10 Roofing Sheet
M11 2nd Floor Plastering Works
Ground Floor Plastering Works
Mechanical Pipes & Fixtures Installation
M14
Electrical Pipes & Fixtures Installation
M15 Plumbing Pipes & Fixtures Installation
M16 Waterproofing
M17 Windows Installation
M18 Ceilings
M19 Partitions
M20 Interior Painting
M21 Exterior Painting
M22
Functionality Test
M23 Land Scaping
DURATION (Days)
8
6
5
14
16
14
5
5
4
3
7
6
8
10
10
3
2
10
12
15
12
1
1
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 4 steps

Recommended textbooks for you

Computer Networking: A Top-Down Approach (7th Edi…
Computer Engineering
ISBN:
9780133594140
Author:
James Kurose, Keith Ross
Publisher:
PEARSON

Computer Organization and Design MIPS Edition, Fi…
Computer Engineering
ISBN:
9780124077263
Author:
David A. Patterson, John L. Hennessy
Publisher:
Elsevier Science

Network+ Guide to Networks (MindTap Course List)
Computer Engineering
ISBN:
9781337569330
Author:
Jill West, Tamara Dean, Jean Andrews
Publisher:
Cengage Learning

Computer Networking: A Top-Down Approach (7th Edi…
Computer Engineering
ISBN:
9780133594140
Author:
James Kurose, Keith Ross
Publisher:
PEARSON

Computer Organization and Design MIPS Edition, Fi…
Computer Engineering
ISBN:
9780124077263
Author:
David A. Patterson, John L. Hennessy
Publisher:
Elsevier Science

Network+ Guide to Networks (MindTap Course List)
Computer Engineering
ISBN:
9781337569330
Author:
Jill West, Tamara Dean, Jean Andrews
Publisher:
Cengage Learning

Concepts of Database Management
Computer Engineering
ISBN:
9781337093422
Author:
Joy L. Starks, Philip J. Pratt, Mary Z. Last
Publisher:
Cengage Learning

Prelude to Programming
Computer Engineering
ISBN:
9780133750423
Author:
VENIT, Stewart
Publisher:
Pearson Education

Sc Business Data Communications and Networking, T…
Computer Engineering
ISBN:
9781119368830
Author:
FITZGERALD
Publisher:
WILEY