3. Fill-out the table below using the missing data calculations. Lot Side Length (m) Latitude (m) Bearing N 50° W N 10° E S 60° E Departure (m) АВ 200 BC 300 CD 500 DA

Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter4: Measuring Site Work, Excavation, And Piling
Section: Chapter Questions
Problem 8RQ
icon
Related questions
Question
100%
3. Fill-out the table below using the missing data calculations.
Lot Side Length (m)
Latitude (m)
Bearing
N 50° W
N 10° E
S 60° E
Departure (m)
АВ
200
300
500
BC
CD
DA
4. Write here the calculations used in the missing data calculations:
Transcribed Image Text:3. Fill-out the table below using the missing data calculations. Lot Side Length (m) Latitude (m) Bearing N 50° W N 10° E S 60° E Departure (m) АВ 200 300 500 BC CD DA 4. Write here the calculations used in the missing data calculations:
CE0015L – Fundamentals of Surveying
Field Work 8 – Subdivision Lots and Missing Data
Objectives:
1. To determine missing line latitude in a subdivision lot survey.
2. To determine missing line departure in a subdivision lot survey.
3. To determine missing line distance in a subdivision lot survey.
4. To determine missing line bearing in a subdivision lot survey.
Activity Guide:
1. Solve for the missing line details: latitude, departure, distance, and bearing.
Lot Side Length (m)
Latitude (m)
Bearing
N 50° W
N 10° E
S 60° E
Departure (m)
?
АВ
200
?
300
500
?
BC
?
?
?
CD
DA
?
?
?
2. Draw a sketch for the Subdivision Lot here.
Transcribed Image Text:CE0015L – Fundamentals of Surveying Field Work 8 – Subdivision Lots and Missing Data Objectives: 1. To determine missing line latitude in a subdivision lot survey. 2. To determine missing line departure in a subdivision lot survey. 3. To determine missing line distance in a subdivision lot survey. 4. To determine missing line bearing in a subdivision lot survey. Activity Guide: 1. Solve for the missing line details: latitude, departure, distance, and bearing. Lot Side Length (m) Latitude (m) Bearing N 50° W N 10° E S 60° E Departure (m) ? АВ 200 ? 300 500 ? BC ? ? ? CD DA ? ? ? 2. Draw a sketch for the Subdivision Lot here.
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Dimensional homogeneity
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Architectural Drafting and Design (MindTap Course…
Architectural Drafting and Design (MindTap Course…
Civil Engineering
ISBN:
9781285165738
Author:
Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:
Cengage Learning