2. State whether Rissa can complete this cycle within two months and comment on the efficiency of the operation. 3. Assign each worker (L-P) to a machine (1-5) to minimize cost 4. State the total cost of the assignment.

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question

Section B -  Please assist with # 2, 3 & 4 if possible. Thank you.

II. GARMENT CONSTRUCTION
Additionally, Rissa is interested in automating the creation of clothing under her own brand.
Each garment pattern goes under two processes in the following order (See table below).
Job
A
Section B
B
C
D
E
F
Job
L
M
N
0
Operation Time (Days)
Design
P
5
6
16
1
13
17
Rissa will also need part time workers to assist with garment construction. Each worker will
specialize in using only one machine to minimize cost.
18
4
Machines
Production
5 12 10
2
15
7 14
15
9
11
1 2 3 4
3
7
11 12 3 10
5
7
13
8 12
16
7 9
5 13 17 11 12
9
1. Draw an optimal diagram showing the sequence of jobs and the cumulative time taken to
complete this cycle (jobs A-F) in days.
2. State whether Rissa can complete this cycle within two months and comment on the
efficiency of the operation.
3. Assign each worker (L-P) to a machine (1-5) to minimize cost
4. State the total cost of the assignment.
Transcribed Image Text:II. GARMENT CONSTRUCTION Additionally, Rissa is interested in automating the creation of clothing under her own brand. Each garment pattern goes under two processes in the following order (See table below). Job A Section B B C D E F Job L M N 0 Operation Time (Days) Design P 5 6 16 1 13 17 Rissa will also need part time workers to assist with garment construction. Each worker will specialize in using only one machine to minimize cost. 18 4 Machines Production 5 12 10 2 15 7 14 15 9 11 1 2 3 4 3 7 11 12 3 10 5 7 13 8 12 16 7 9 5 13 17 11 12 9 1. Draw an optimal diagram showing the sequence of jobs and the cumulative time taken to complete this cycle (jobs A-F) in days. 2. State whether Rissa can complete this cycle within two months and comment on the efficiency of the operation. 3. Assign each worker (L-P) to a machine (1-5) to minimize cost 4. State the total cost of the assignment.
Expert Solution
steps

Step by step

Solved in 4 steps with 2 images

Blurred answer
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,