15. The slope distance from point F to G is 245 meters. The zenith angle from F to G is 105.25°. Determine the horizontal distance from F to G.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Please answer question 15
### Surveying Techniques

#### Problem 14
**Question:** Describe the process of setting up a level.

**Explanation:** Setting up a surveying level involves several steps to ensure accurate measurements:
- **Choose a stable location:** Find a location with firm, stable ground to minimize errors due to shifting or vibrations.
- **Extend the tripod legs:** Adjust the tripod legs so that the head is roughly level.
- **Attach the level:** Carefully secure the level to the tripod.
- **Center the bubble:** Use the instrument's foot screws to adjust and center the bubble in the circular level.
- **Fine-tune the horizontal alignment:** After rough leveling, use the fine adjustment screws for precise leveling.

#### Problem 15
**Question:** The slope distance from point F to G is 245 meters. The zenith angle from F to G is 105.25°. Determine the horizontal distance from F to G.

**Explanation:** 
To determine the horizontal distance (d) from point F to G when given the slope distance (L) and the zenith angle (θ), use trigonometry.

1. **Zenith angle adjustment:** Convert the zenith angle to the corresponding angle of elevation (ϕ):
   \[
   ϕ = 180° - θ = 180° - 105.25° = 74.75°
   \]

2. **Calculate the horizontal distance:** Using the cosine function, where \(d = L \cos(ϕ)\):
   \[
   d = 245 \cos(74.75°)
   \]

3. **Computation:**
   \[
   d ≈ 245 \times 0.261 = 63.94~\text{meters}
   \]

**Result:** The horizontal distance from point F to G is approximately 63.94 meters.
Transcribed Image Text:### Surveying Techniques #### Problem 14 **Question:** Describe the process of setting up a level. **Explanation:** Setting up a surveying level involves several steps to ensure accurate measurements: - **Choose a stable location:** Find a location with firm, stable ground to minimize errors due to shifting or vibrations. - **Extend the tripod legs:** Adjust the tripod legs so that the head is roughly level. - **Attach the level:** Carefully secure the level to the tripod. - **Center the bubble:** Use the instrument's foot screws to adjust and center the bubble in the circular level. - **Fine-tune the horizontal alignment:** After rough leveling, use the fine adjustment screws for precise leveling. #### Problem 15 **Question:** The slope distance from point F to G is 245 meters. The zenith angle from F to G is 105.25°. Determine the horizontal distance from F to G. **Explanation:** To determine the horizontal distance (d) from point F to G when given the slope distance (L) and the zenith angle (θ), use trigonometry. 1. **Zenith angle adjustment:** Convert the zenith angle to the corresponding angle of elevation (ϕ): \[ ϕ = 180° - θ = 180° - 105.25° = 74.75° \] 2. **Calculate the horizontal distance:** Using the cosine function, where \(d = L \cos(ϕ)\): \[ d = 245 \cos(74.75°) \] 3. **Computation:** \[ d ≈ 245 \times 0.261 = 63.94~\text{meters} \] **Result:** The horizontal distance from point F to G is approximately 63.94 meters.
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Foundation systems
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning